My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150259 contract docs
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150259 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 3:38:45 PM
Creation date
4/22/2011 10:39:26 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150259
Contractor Name
Bijou Irrigation District
Contract Type
Loan
Water District
1
County
Morgan
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3�jOLI IRRIGATION SYSTEM <br />Phone (9T0) 867-2222 <br />FAX (970) 867-2294 <br />229 Prospect St. <br />P.O. 6ox 972 <br />Fort Morgan, CO 80701 <br />Mr. Kirk G. Russell, P.E. '` <br />Colorado Water Conservation Board � <br />1580 Logan Street, Suite 750 <br />Denver, Colorado 80203 <br />RE: Request for Extension of Construction Time Limit, Contract No. C150259 <br />To Whom It May Concern: <br />The Board of Directors of the Bijou Irrigation District formally requests an additional <br />time period to complete the construction of the Empire Reservoir East Dike <br />Rehabilitation Project. <br />Facts and Circumstances <br />This project was started in October of 2007, and construction was scheduled for three (3) <br />phases to Ue completed over the next three years, with construction to be finished in <br />March of 2010. The 2009 dam safety inspection for �Empire Reservoir, when completed, <br />revealed that the Bijou Irrigation District needed to complete an additional phase four (4). <br />Since the additional Phase met the same criteria for the scope of the loan and additional <br />revenue was still available, said Phase was incorporated into Loan Contract Number <br />C1502S9. <br />Please regard this letter as a formal request for extension on the tirne to complete the <br />entire Ernpire Reservoir East Dike Rehabilitation Project. An additional one (1) year <br />period will be required to �nish the Project. The Bijou Irrigation District Board of <br />Directors would appreciate the extension to be until March 31, 2011. <br />If you have any questions regarding this request, please contact the District ofiice at <br />(970) 867-2222. <br />Thank you for your consideration in this matter. <br />Sincerely, <br />%�Y,�,�.�-' �,%�r,.�-U~ ' <br />Mike Groves, President <br />THE BIJOU IRRIGATION DISTRTCT <br />The Bijvu Irrigation District - The Bijou Irrigation Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.