My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150316 approval ltr
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150316 approval ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 3:27:05 PM
Creation date
4/20/2011 9:53:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150316
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE (JF C�L�RAD4 <br />Colorado Water Conservation Board <br />aepartment of Naturai Resources <br />1313 Sherman 5treet, Roam 72 ( <br />[�nver, Colorado 80203 <br />Piwne: (303) 866-344i <br />��� t303) 866-4474 <br />www.cwcb.state.co.us <br />March 21, 2011 <br />Mrs. Jane Devine <br />Trinchera Irrigation Company <br />P.O. Box 41 <br />Blanca, CO 81123 <br />Re: Garland #2 Canat Repair Project <br />Contract Number C 150316 <br />Dear Mrs. Devine: <br />lotm w. Hickenlooper <br />Govemor <br />Mike King <br />pNR Executive Qirector <br />lennifer L. Gimbel <br />cwca D�co� <br />I am pleased to inform you that on March 16, 20l 1 the Colorado Water Conservarion Board <br />approved your loan request for the GarIand #2 Canal Repair Project as described in the <br />appIication and approved Loan Feasibility Study titled "Feasibility of Garland Two Canal <br />Repairs," dated January 74, 2011. The Board approved a loan not to exceed $251,793 {$249,300 <br />for project costs and $2,493 for the 1% Loan Service Fee). The loan tert�as shalt be 3U years at <br />an interest rate of 2.75% per armum. I have attached a copy of the updated Board memo dated <br />March 21, 201 l, that includes the Board's apprnval. <br />After the Board approves a loan there are a few steps th�t remain in the loan process including: <br />A) Contractin�: An approved contract must be in place before funds can be dishursed. Vaughn <br />McWilliams wiil iniriate the loan contractin� process for this project. When all of the <br />contract canditions are met and the contract is executed the Company may request loan <br />funds to cover �ligibie project expenses. You can contact Vau�;hn at {303) 866-3441 x 3227 <br />regarding the requirements. <br />B) Desi�n/Con$truction: You rnust adhere to the CWCB Design and Construction <br />Administratian Procedures. Kirk Russell wiIl contact you regarding t}us pttase of the <br />pracess. Kirk will make construct�on site visits, wh,ich will be the basis of pay estimates for <br />disbursement of ycsur loan funds. Yo� can contact Kirk at his d�sk at (303) $6b-3441 x <br />3232 or cell phane (303) 956-5653. <br />On behalf of the Board, I would like to thank you fc�r yaur interest in a loan from the Colorado <br />Water Conservation Boazd. <br />Fnterstute & Federal • Watershed & 6'laod Protection • Stream &(.ake Protection • Pinance <br />Water Informatioa • Water C:oastrvation & Droug,ht Planning • Water Supply Pianniag <br />
The URL can be used to link to this page
Your browser does not support the video tag.