My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150249 proj summary
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150249 proj summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 3:01:27 PM
Creation date
3/10/2011 3:25:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150249
Contractor Name
Black Dike Pipeline Company
Contract Type
Loan
Water District
0
County
Montezuma
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BLACK DIKE PIPELINE COMPANY <br />PIPELINE PROJECT <br />.. .. a • . _ <br />, 4' - <br />��., .' � � ' ; <br />s _ - <br />,� "<�iti' + F ` + b <br />� � y ..'L N� ��- c �jYl <br />Y'.�/ <br />t � 1 {'�' 7 �. �� rC � <br />`++�`; �;�,� .. <br />�� � <br />ti ��. � 1 aW. �� i <br />b� <br />- * ��Y il � {��J ���S <br />. _ i �� � �� �.. � � <br />' � , �.v�nR+ , `'� <br />�� <br />k l'� <br />* � � <br />Project Description <br />,�;:,�, _. <br />c - <br />e <br />`r . <br />a �. <br />The B1ack Ditch Pipeline Company, located in Cortez County (west of the Town of Cortez), manages the <br />Black Dike Ditch for the benefit of nine shareholders. The nearly four mile ditch is a carriage ditch <br />diverting water for irrigation purposes from McElmo Creek at a peak rate of 7.75 cfs, for an annual <br />average of 1,003 acre-feet. Construction of the ditch commenced in 1889 and the current ditch and <br />diversion structure are in need of rehabilitation. This project was responsible for the installation of nearly <br />four miles of PVC pipeline (15"/21" diameter), including valves, drains, vents and metered delivery <br />points; construction of a new diversion structure; and channel improvements. In doing so, this project <br />increased the efficiency of the ditch while reducing salinity impacts in the Colorado River, thereby <br />qualifying for a grant from the Natural Resources Conservation Service (NRCS) in the amount of <br />$391,000. <br />Project Data <br />Sponsor: Black Dike Pipeline County: Cortez Water Source: McElmo Creek <br />Company <br />Terms of Loan: $207,000 (initially $598,000), Substantial Completion Date: 10-1-2008 <br />over 30 years @ 2.85% <br />Design Engineer: Harward Irrigation Systems Inc., Springville, UT <br />Construction Contractor: Harward Irrigation Systems Inc., Springville, UT <br />Lewis Excavation, Mancos, CO <br />Construction Elements: * Installation of 20,000 LF of PVC piping (15"/21" diam.) <br />* metered delivery points * construction of a new diversion structure <br />:. ..� . <br />� <br />r: <br />�• .; <br />.. ) '�, t �� •,T. - , <br />� 4��i �� � � .� <br />.. � A 5fi: K t � 1�� ,. <br />i3 � , <br />} ` i rn i�,i � _' <br />�H T � A ! <br />Average Annual Diversion: 1,003 acre-feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.