Laserfiche WebLink
4 � <br />Ms. Lissa Pinello, President <br />Penrose Water District <br />November 27, 2006 <br />Page 2 of 2 <br />c) You must adhere to the CWCB Desi and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCB requirements concerning project <br />bidding, design, and construction. Tim will make construction inspections, which will <br />be the basis of the monthly pay estimates for disbursement of your loan funds. Tim's <br />phone number is 303-866-3480. <br />On behalf of the Boazd, <br />Conservation Board. <br />Sincerely, <br />I would like to thank you for applying for a loan from the Colorado Water <br />�t�like SerCet <br />(signed copy on file at CWCB) <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br />�rccce ,�ohnson <br />(signed copy on file at CWCB) <br />Bruce Johnson, P.E. <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Boazd <br />cc (w/ Attachment): Mr. Harold Miskel, Board Member, Colorado Water Conservation Board <br />CWCB Section B Staff <br />Amy Stengel, AGO <br />• <br />� <br />1� <br />Flood Protection • Water Project Planning and Financing • Stream and Lake Protection <br />Water Supply Protection • ConservaHon Planning <br />