My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153564 PIF contract
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C153564 PIF contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2010 12:57:56 PM
Creation date
12/23/2010 12:50:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153564
Contractor Name
Bauer Lakes Water Company
Contract Type
Loan
Water District
34
County
Montezuma
Bill Number
HB 85-1042
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. <br />d. Land Oamership. - will delineate private and public lands on the <br />map. <br />5. Chapter IV, Water. <br />a. Plater Requixements. <br />1. will shovr consumptive use, effective rainfall and isrigation <br />efficiency of project area. <br />2. will extrapolate monthly a�icultural requirements. <br />3. vrill estimate transportation losses. <br />4, will develop monthly water dinersion requirements by ccmbin- <br />ing (2) and (3)• <br />5. N.A. <br />b. Surface Water Supply. <br />1. will shox diversion records for last 10 consecutive years. <br />2. no recreational, fish or wildlife benefits claimad. <br />3. I haven�t seen your 8upplement. W hen I get one, I'll make a <br />stab at developing the i.nformation requested. <br />c. Ground-water. -N.A. , <br />d. Water Kights. - <br />1.& 2. - will combine these, listing historic, present �d future <br />effects. <br />e. '�iater Utilization. <br />1. will show amount of water available to the pro�ect, from b. & d. <br />above. <br />2. N.A. <br />3. N.A. ���� <br />1�. N. A. <br />f. Water ;uality. <br />1. will show chemical & physica characteristics of project water <br />suPP1Y• <br />2. N.A. - since no additio��e s loped. <br />3. N.A. <br />!t. No special requi.rements known. <br />5. will provide analysis o£ sedimentation of reservoir, diversion <br />vrorks and transport systems. <br />6. Chapter V, Plan of Development. <br />a. Physical Plan. - wi.11 describe the physical plan for providing (1) <br />Irrigation Water. (2) thru (6) --N.A. <br />b. Geologic Investigations. - since the dam is founded on a Sandstone <br />fa'mation, and no increase in height or stora�e is contemplated, I <br />can provide all the geologic description necessary. <br />c. Design. <br />(1) thru (!t) - will describe criteria & standards to be used in <br />desi�nine dam & appurtenances. <br />5 . N. A. - <br />6. vrill evaluate flood and erosiorj hazards. <br />7, thru 12. - N.A. <br />13. will describe availabilit;� of construction materials. <br />1l�. N. A. <br />d. Structure Plans. <br />1. N.A. <br />2, will describe outlet works of dam, and design criteria, no <br />other structures comtemplated. <br />e. Drainage.- N.A. - since no additional water is bein� developed. <br />f. Sedimentation. - will describe sedimentation notential- but it is <br />very sli�ht. <br />e. Right-of discuss R.O.W, requisements, and Permit require- <br />ments for quarrying rock for rip-rap on Forest lands. <br />7. Chapter VI, Estimated Costs. <br />a. Costs of Construction <br />1. thru 7. - will prepare detailed cost estimate. <br />b. N.A. - b to 8 weeks constructicn period expedted. <br />c. 0& M& R Costs. - will rmovide complete schedule. <br />d. F3nergency Operating FY�nd. - will request guidelines fY'om the Board <br />and prepare proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.