Laserfiche WebLink
_, '�-G 85� �o ( <br />Furm 6-AC-02A DEPARI k.r.P17 OR A NCY NUMBER <br />34-04-00 <br />CONTRACT ROUTING NUMBER <br />S � <br />$a,000 <br />CONTRACT <br />24th September 19 by and between the <br />THIS CONTRACT, made chis day of , Natural Resources <br />State of Color do for the use and benefit of �he De artme t of ' <br />(Colorac�o Water Conservation �oar�), <br />hereinafter referred to as the State, and 'z the Bauer Ldkes Water' Company, <br />11747 Co. Rd. 41, Mancos, CO 81328, <br />hereinaFter referred to as the contractor, <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains av ilable f r payment in Fund Number 4008 , <br />G(L Account Number 5268X , Contrac[ Encumbrance Number and <br />ABL Account Num�,er 12680, Org. Unit 77 <br />WHEREAS, reyuired approval, clearance and coordination has been accomplished from and with appropriate <br />agencirs;and <br />WHEREAS, pursuant to the i, of section 37-60-119, <br />Colorado Revised Statutes 197 d, the State is <br />authorized to construct certai r pro'e ts for the benefit of <br />the people of the State of Color ,� <br />WHEREAS, the Bauer Lak��t pany has made application <br />to the State for the improvement of its existing facility, such <br />improvement of the facility is hereinafter someti�es referred to <br />as the project; and <br />WHEREAS, the Contractor is a mutual ditch cpmpany within the <br />5tate of Colorado; <br />NOW THEREFORE, it is hereby agreed that <br />t. The Contractor shall have a feasibility report prepared <br />and directed to the problem of improving the facilities of the <br />Bauer No. 1 dam in accordance with a proposal for a oroject <br />feasibility report prepared by the consulting engineering firm of <br />Roach Engineering (the Consultant) and approved by the State, <br />received on September 6, 1984, which proposal is attached hereto <br />as Exhibit A and made a part of this contract. <br />2, Fifteen (15) copies of the final report called for in <br />this contract shall be furnished to the State not later than <br />November 15, 1984, unless such time is extended by mutual <br />agree�nent of the parties hereto in writing. <br />3. As compensation for the services of the Contractor, the <br />State shall pay to the Contractor the sum of Two Thousand Dollars <br />($2,000) in the manner following: <br />a. Sixty percent (60�), to wit, One Thousand Two Hundred <br />Dollars ($1,200) of the total amount due in two (2) <br />monthly installments of Six Hundred Dollars ($600) each, <br />commencing on October 15, 1984. <br />b. The remaining forty percent (40�), to wit, <br />Eight Hundred Dollars ($800) within forty (40) days <br />following receipt and acceptance of the written report <br />�. � �.f t�'21� ^nntraf�t, <br />S�Cl:iiicu ii. �+divy'�uY "' ' <br />4. The total cost of services to be rendered for the <br />Contractor by the Consultant is Four Thousand Dollars ($4,000) <br />and the Contractor shall pay the sum of Two Thousand Dolalrs <br />($2,000).as agreed to by resolution dated August 24, 1984, which <br />is hereby attached and made a part of this contract as Exhibit B; <br />and in no event shall this payment be the liability of the State <br />of Colorado. <br />395 530'F1014 Page t of 4 pages 1 0 3 <br />'(See instmctie�nson reverse of last page.) bauer/1 <br />