My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153564 PIF contract
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C153564 PIF contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2010 12:57:56 PM
Creation date
12/23/2010 12:50:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153564
Contractor Name
Bauer Lakes Water Company
Contract Type
Loan
Water District
34
County
Montezuma
Bill Number
HB 85-1042
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a <br />EXHIBIT D <br />SCHEDULE A <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRA'K PROCEDURES <br />1. Board approval of engineering firm and engineering <br />aqreement between engineering firm and project sponsor, <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br />3. Approval of detailed plans and specifications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must nlso be approved by State Engineer's <br />office). <br />4, Board staff approval of n� the project. Board <br />staff present at bid open ��, nstruction. <br />�, <br />5. Project sponsor may issue th *-� ;�ward and the <br />notice to proceed with �t i� { e contractor <br />(both notices must be � by the Board staff before <br />they are issued), <br />6. Conduct a pre-construction conference. Approval of <br />construction schedule by Board staff. <br />7. Construction commences. The Board sta°f makes periodic <br />inspections during construction: AlI change orders must <br />be approved by the 13oard staff in advance $nd before anv <br />construction on change items can commence. Emergency r <br />i:ems cleazed by telephone. <br />8. The consulting engineer cer:i�ies that the p:oject has . <br />been completed according to aparoved drawin�s an� <br />specifications and azzanges for final ir.sxc:ior.. <br />9. Final inspertian and acceptazce o` as-bu:l: projec: by <br />Board stef�, <br />10. Submittal of as-built drawings to Board steff for <br />aparoval and filing. <br />EXHIBIT D to Project Contract <br />(Schedule A) � . <br />� sch ed/ a <br />
The URL can be used to link to this page
Your browser does not support the video tag.