My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150303 Contract
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150303 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2011 8:47:07 AM
Creation date
12/23/2010 10:11:22 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150303
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 5— SCHEDULE OF EXISTING DEBT <br />Lender CWCB, $410,135 balance remaining, annual payment of $18,623, maturity date of <br />September 2034. <br />Lender Three-S Ranch, Inc., $325,000 at 0.6% interest, unsecured, to be paid off with <br />CWCB funds. <br />SECTION 6 - COLLATERAL <br />The collateral provided for this loan, as evidenced by the executed Deeds of Trust, in the <br />form attached as Appendix 5 and Appendix 6 and incorporated herein, shall be an <br />undivided one hundred percent (100%) interest in Smith Reservoir and the water rights <br />associated with Smith Reservoir, as more particularly described in the attached Deeds of <br />Trust ("Collateral"). <br />SECTION 7— ADDITIONAL CONDITIONS S� CONTRACT REQUIREMENTS <br />Borrower shall pay off all bridge financing using CWCB funds as provided for in Sections <br />5 and 9.K herein. <br />SECTION 8— CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BoRROwER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PRO�ECT. <br />B. The BORROWER and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37-87-105 C.R.S., the BoRROwER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BoRROwER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BoRROwER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BoRROwER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />Appendix 1 to Loan Contract C150303 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.