Laserfiche WebLink
Colorado Water Conservation Board Pa� z <br />Dam Site Inventory - List of References 02 Aug-96 <br />1 76th U.S. Congress, House Document 693, 4/10/40 <br />2 Blue South Platte Project Planning Report, June 1948 <br />3 City of Aurora, Application for Conditional Water Right Decree, Aprii 29, 1986 <br />4 Colorado Division of Water Resources, Water Rights Tabulations <br />5 Colorado River Water Conservation District, Letter dated 7/23/87 <br />6 Colorado Water Resources & Power DevelopmeM Authority, letter dated May 1, 1987 <br />7 Corps of Engineers, Omaha and Kansas City Districts, letters dated April 8 and 22, 1987 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />Corps of Engineers, Report on Review Survey, Flood Control and Allied Purposes, October <br />1968 <br />CWCB 8 Dames 8� Moore, Hardin Dam Project Study, January 1983 <br />CWCB & Tudor Engineering Co., Cache la Poudre Project Study, July 1983 <br />CWR8�PDA with R. W. Beck and Dames 8 Moore, St. Vrain Basin Reconnaissance Study, <br />February 1986 <br />Edwarci W. Blank, Division 6 Engineer, letter to CWCB received October 30, 1995 <br />Hydro Triad, LTD., West Divide Reformulation Project, August 1986 <br />Irrtemational Engineering Company, Yellow Jacket Project . Report,;CWC6, December 1982 <br />Jim Hall, Acting Division 1 Engineer, letter to CWCB dated November 2, 1995 <br />Ken Knox, Division 4 Engineer, letter to CWCB dated Odober 24, 1995 <br />Leonard Rice Water Engineers, Potential Water Storage Sites in Rio Grande Basin, 6/25/87 <br />Metro Denver Water Supply Systemwide EIS, Appendix 4, Volumes 4, 5, 8� 6, December <br />1986 <br />Narrows Unit Final EIS, May 1976 <br />Northem Colorado Water Conservancy District, letter dated October 23, 1987 <br />Trans County Water Users Association, Application for Conditional Decree, 12/31/75 <br />U.S. Bureau of Reclamation, Dolores Project Definite Plan Report, April 1977 <br />U.S. Bureau of ReGamation, Dolores Project Feasability Report, November 1963 <br />U.S. Bureau of Reclamatipn, Dolores Project Final EIS, May 1977 <br />U.S. Bureau of Reclamation, Durango, Colorado <br />