Laserfiche WebLink
QPP ��OT OF Tye, <br />O � ti United States Department of the Interior <br />BUREAU OF RECLAMATION <br />Upper Colorado Region <br />CH , —" Western Colorado Area Office <br />2764 Compass Drive, Suite 106 <br />IN REPLY REFER To: Grand Junction, CO 81506 <br />WCG- SMccall <br />ADM -13.00 <br />Ms. Jennifer Gimbel <br />Director, Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver CO 80203 <br />Subject: Selenium Management Program <br />Dear Ms. Gimbel: <br />Congratulations and thank you for your support of the Memorandum of Understanding on the <br />Gunnison Basin Selenium Management Program (MOU). Attached for your use is the executed <br />copy of the MOU. Your continued work and support to develop the program is very much <br />appreciated. <br />Since our agencies' managers met in Montrose in May, progress has been made in developing <br />the selenium management program while at the same time we are continuing and accelerating <br />on- the - ground activities to reduce salinity and associated selenium loading to the river system. <br />Recent activities include: <br />• A new Funding Opportunity Announcement (FOA) for Reclamation's Basinwide Salinity <br />Control Program has been released and work, including salt load allocation and mapping, <br />commenced in preparation of this. <br />• A comprehensive salinity control study for the Lower Gunnison Basin is being <br />considered that could parallel and greatly enhance selenium control planning. <br />• Coordination and funding of research and data collection headed by the USGS continues. <br />Baseline information, trend data, and land use data/analyses are under development. <br />Work continues on identifying priority selenium loading areas. Water quality monitoring <br />continues and a new monitoring site was established at the mouth of the North Fork. <br />• Activity for the East Side Delivery System Optimization Planning continued and <br />included work by Cal Poly to plan more efficient systems and work by Reclamation and <br />others to locate and map irrigation features on the east side of the Uncompahgre Project. <br />Mapping on other areas of the basin also continued. <br />• Work is underway with the Biology Committee of the Upper Colorado River Recovery <br />Program to coordinate monitoring in the Gunnison and Colorado rivers and to coordinate <br />fish tissue sampling for selenium. <br />• Design and construction work continued on Phases 3 & 4 within the Uncompahgre <br />Project area which involves piping approximately 22 miles of existing laterals on the east <br />side of the Uncompahgre Valley. <br />