My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MOU Planning, Development and Operation of the Managed Groundwater Recharge Facilities on State Wildlife Areas located in the Lower South Platte River
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
MOU Planning, Development and Operation of the Managed Groundwater Recharge Facilities on State Wildlife Areas located in the Lower South Platte River
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2010 11:23:34 AM
Creation date
11/23/2010 11:22:47 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Memorandum of Understanding for the Planning, Development, and Operation of the Managed Groundwater Recharge Facilities on State Wildlife Areas located in the Lower South Platte River
State
CO
NE
Basin
South Platte
Water Division
1
Date
4/19/2009
Title
MOU Planning, Development and Operation of the Managed Groundwater Recharge Facilities on State Wildlife Areas located in the Lower South Platte River
Water Supply Pro - Doc Type
Contract/Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
will not be included as part of the Project budget. However, CROW will, <br />upon request, provide a copy of Its Project staffing budget to SPWRAP. <br />VII. OWNERSHIP OF WATER RIGHTS AND FACILITIES, ALLOCATION OF <br />RECHARGE CREDITS <br />A. The water rights for the Tamarack Managed Groundwater Recharge <br />Project facilities shall be decreed in the name of the State of Colorado, <br />Department of Natural Resource, Colorado Wildlife Commission, Colorado <br />Division of Wildlife. CDOW is obtaining these water rights for CDOW and <br />not as an agent of SPWRAP or any other party. CDOW will own all the <br />facilities constructed on the SWAs pursuant to this MOU, whether or not it <br />paid for initial construction, repair and maintenance of these facilities. <br />B. Any water from the Project that accretes to the South Platte River in <br />Colorado is, for purposes of this MOU, referred to as "Recharge Credits. <br />The Operating Committee may decide to recapture Project accretions <br />through pumping of Project wells ( "Recaptured Credits "). The Recharge <br />Credits allocated to CDOW are referred to as "CDOW Credits." The <br />Recharge Credits allocated to meeting PRRIP obligations are referred to <br />as "Program Credits." <br />C. The target pumping schedule will necessarily result in credits for <br />recharged water that do not, due to timing or flow considerations, directly <br />benefit the flow targets established by the PRRIP. The Recharge Credits <br />that are neither allocated to CDOW nor to meeting PRRIP obligations are <br />referred to as "Excess Credits ". <br />D. Twenty percent of the Recharge Credits that accrue to the river on an <br />annual basis as a result of the target pumping schedule will be allocated to <br />the CDOW for its use as CDOW Credits. At the annual meeting of the <br />Operating Committee, the CDOW shall indicate what portion of its <br />allocation will be used each year for their projects. Should CDOW not be <br />able to use any of these credits for their projects, the unused CDOW <br />credits will revert back to the control of SPWRAP. <br />E. Additional Recharge Credits may be generated by pumping Project wells <br />at times or in amounts in addition to those required by the target pumping <br />schedule. Allocation of credits generated by pumping outside of the target <br />pumping schedule by either party shall be discussed with and allocated by <br />the Operating Committee. <br />F. The Operating Committee will seek to enter into contracts to trade Excess <br />Credits generated by the Project for recharge credits generated by others <br />that would directly benefit the flow targets established by the PRRIP. <br />When such trades are not feasible, the Operating Committee will seek to <br />7 Tamarack MOU <br />
The URL can be used to link to this page
Your browser does not support the video tag.