Laserfiche WebLink
� Scope of Work 4-10-2009 <br />Colorado River Basin Nonconsumptive Needs Quantification <br />■ Develop flow curves for additional nonconsumptive attributes <br />■ Peer review existing flow ecology curves with local basin Colorado Division of Wildlife <br />biologists and other experts <br />■ Based on metrics for biological indicators generated during the Watershed Flow Evaluation <br />Tool Pilot Study, generate risk framework mapping of flow conditions vs. the biological <br />indicators. The biological indicators include: trout, riparian, invertebrates, and warm water <br />fishes. <br />■ Facilitate dialogue with local biologists and stakeholders on distribution of biological <br />indicators throughout the basin <br />■ GIS maps will show areas that have various levels of support for the biological indicators <br />based on the flow metrics calculated in Task 2.3 <br />The Consultant team will prepare a memo that describes any recommended changes to the flow <br />ecology curves and the GIS xnapping. Consultant team will generate GIS mapping that can be <br />utilized by stakeholder group. <br />Task 2.5 Compare Results of Watershed Flow Evaluation Tool with Other Basin <br />Efforts <br />Cost: $34,376 ($34,376 WSRA, $0 Match) <br />The Consultant team will compare the results of the flow evaluation tool with other efforts <br />occurring in the Basin such as the Wild and Scenic efforts, site specific analysis of the Colorado <br />River (Task 1) or the Grand County Stream Management Plan. The Consultant tearn will <br />prepare a memorandum describing this comparison and summarize any suggested changes to <br />the technical elements of the Watershed Flow Evaluation Tool. <br />Task 2.6 Finalize Watershed Flow Evaluation Tool, Develop Draft and Final Report <br />and Final Presentation <br />Cost: $44,572 ($44,572 WSRA, $0 Match) <br />Based on comments from stakeholders and comparison efforts in Task 2.5, the Consultant team <br />will finalize the technical elements of the Watershed Flow Evaluation tool. The Consultant team <br />will also develop the following work products which will document the study efforts: <br />■ Develop Draft and Final Report based on memorandums throughout Task 2 <br />■ Develop Final Presentation regarding study results that will be presented at Colorado Basin <br />Roundtable and CWCB Board <br />Deliverables will be produced in electronic format for distribution to stakeholders. <br />Page 7 of 15 <br />