My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado - Co Basin Nonconsumptive Needs Quantification_Statement of Work #2
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Colorado - Co Basin Nonconsumptive Needs Quantification_Statement of Work #2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2012 11:21:29 AM
Creation date
10/26/2010 11:31:24 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Colorado
Applicant
Northwest Colorado Council of Governments
Description
Colorado Basin Nonconsumptive Needs Quantification
Account Source
Basin
Board Meeting Date
3/17/2009
Contract/PO #
150451
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scope of Work <br />Colorado River Basin <br />Nonconsumptive Needs Quantification <br />This Scope of Work is divided into four sections as suggested in the Grant Application <br />Instructions. Section 1 provides a description of each major task associated with the project <br />along with a functional description of who will be completing the work and a description of the <br />deliverables associated with the task. Section 2lists the key personnel proposed for the project <br />along with a brief description of their relevant project experience. Section 3 presents a detailed <br />breakdown of the costs to complete the study and Sectian 4 presents the proposed Project <br />Schedule. <br />Section 1 Task Summary <br />Introduction and Background <br />The Colorado Basin non-consumptive needs assessment committee has been meeting for the 18 <br />months to complete the Colorado Basin's Nonconsumptive Needs Assessrnent which is <br />required under HB05-1177. The committee's efforts have focused on three key efforts: <br />■ Defined functional nonconsumptive attributes in the basin <br />■ Developed a matrix of attributes at risk and associated map of the areas within the Colorado <br />Basin at risk <br />■ Participated in pilot study of the Watershed Flow Evaluation Tool for the Roaring Fork <br />Watershed <br />To further quantify flow needs within the basin, site-specific quantification of nonconsumptive <br />flow needs for the Colorado River between Kremmling, Colorado and No Name, Colorado will <br />be completed and that the Watershed Flow Evaluation Tool be completed for the entire <br />Colorado River Basin to focus future site-specific and water management efforts. <br />Study Objectives <br />The objectives of the study are to: <br />■ Build upon existing quantification efforts in the basin to maintain consistency in approaches <br />and to develop a comprehensive dataset of quantification measures in the basin <br />■ Conduct site-specific quantification of instream flow needs for Colorado River between <br />Kremmling and No Name which would determine the current state of the aquatic ecosystem <br />in this river reach including: <br />1 This revised scope of work reflects the conditions under which the CWCB board approved the grant application on <br />March 17�`, 2009. It meets the additional needs identified in the Water Supply Reserve Account Summary Sheet and <br />all additional changes recommended by the CWCB Board. <br />Page 1 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.