My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150157 feasibility study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150157 feasibility study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 3:44:03 PM
Creation date
8/19/2010 10:46:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150157
Contractor Name
Grand Mesa Reservoir Company
Contract Type
Loan
County
Mesa
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bret Guiitory, Project Engineer <br />June 18, 2003 <br />Page 2 <br />We look fiorward to working with you and the owners of the dam on the outiet repairs and <br />a successful completion of the project. � <br />Sincerely, <br />� <br />�� �-'�� .�_ <br />Jack G. Byers, P.E. <br />Deputy State Engineer <br />Enctosures: Signed CopY of Specifications <br />� Rules 9 and 10, Cobrada Rules and Regulations for Dam Safety and Dam <br />Construction <br />cx: Frank Kuge1, Actir�g Division Engineer <br />Jim Norfleet, Dam Safety Engineer of S crfications) <br />Garrett Jadcson, Dam Safety Engineer {w/Signed Copy pE � <br />Scott King, Water Commissioner <br />John Whit�r�, President, Grand Mesa Reservoir Co. <br />JGB/DB/Jw�d:c:wordtdamsafety�Gra�d Mesa �!8 Approval 6-03.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.