Laserfiche WebLink
Bret Guiitory, Project Engineer <br />June 18, 2003 <br />Page 2 <br />We look fiorward to working with you and the owners of the dam on the outiet repairs and <br />a successful completion of the project. � <br />Sincerely, <br />� <br />�� �-'�� .�_ <br />Jack G. Byers, P.E. <br />Deputy State Engineer <br />Enctosures: Signed CopY of Specifications <br />� Rules 9 and 10, Cobrada Rules and Regulations for Dam Safety and Dam <br />Construction <br />cx: Frank Kuge1, Actir�g Division Engineer <br />Jim Norfleet, Dam Safety Engineer of S crfications) <br />Garrett Jadcson, Dam Safety Engineer {w/Signed Copy pE � <br />Scott King, Water Commissioner <br />John Whit�r�, President, Grand Mesa Reservoir Co. <br />JGB/DB/Jw�d:c:wordtdamsafety�Gra�d Mesa �!8 Approval 6-03.doc <br />