My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150157 feasibility study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150157 feasibility study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 3:44:03 PM
Creation date
8/19/2010 10:46:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150157
Contractor Name
Grand Mesa Reservoir Company
Contract Type
Loan
County
Mesa
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Bret Guitlory, Project Engineer <br />June 18, 2003 <br />Page 2 <br />We understand the ouUet repairs are only one part of a multiple phase rehabilitation <br />project for the dam. You should be aware of aN other safety concems, specificaNy seepage and <br />the inadequate spil{way must be addressed t�fore the current storage restriction woukl be <br />revised or reRaved. <br />We look forward to working wi#h you and the owners of the dam on the outiet repairs and <br />successfui compiet�n of the overaq rehabilitation project. <br />Sincerely, <br />�./����,----- <br />ack G. Byers, P.E. <br />Deputy State Engineer <br />Endosures: Signed Copy of Spec�cations <br />� Rules 9 and 10, Cdorado Rules and R�ulations #or Dam Safety and Dam <br />Construcction <br />cc: Frank tGx,�el, Adir� Division Engineer <br />Jim IUorfleet, Dam 3afety Engineer <br />Garrett Jadcson, Dam 3afety Engineer (w/Signed Copy of Speaficafions) <br />Scott King, Water Commissioner <br />John Whfing, President, Grand N�sa Reservoir Co. <br />JGB/DB/JN/gld:Grand Mesa #1 Appr�nval 6-03.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.