My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150157 approval letter
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150157 approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 3:44:03 PM
Creation date
8/19/2010 10:36:20 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150157
Contractor Name
Grand Mesa Reservoir Company
Contract Type
Loan
County
Mesa
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�/� <br />STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br />Bill Owens <br />Governor <br />Greg E. Walcher <br />September 26, 2003 Executive Director <br />Rod Kuharich <br />CWCB Director <br />Dan McAuliffe <br />Mr.Rod Bonnell, Secretary-Treasurer Depu�D��tor <br />Grand Mesa Reservoir Co. RE: Rehabilitation of the <br />100 Whiting Road Grand Mesa Reservoirs #1 and #9. <br />Whitewater, CO 81527 Loan Approval <br />Dear Mr. Bonnell, <br />I am pleased to inform <br />approved your request <br />understand the loan will <br />Reservoirs #1 and #9, <br />Mesa Reservoir #1. <br />you that the Colorado Water Conservation Board (CWCB) has <br />for a Small Project Loan from the Construction Fund. V1�e <br />be used to rehabilitate the outlet systems on the Grand Mesa <br />and to complete spillway and seepage control work on Grand <br />The Board approved a loan from the Construction Fund in an amount of $180,000 at the <br />loan terms of 2.4% for 20 years or 2.7% for 30 years. The approval includes the provision <br />for a 1% loan service charge, which may be paid at substantial completion of the project, <br />or financed along with the loan. I have attached a copy of the updated Board memo <br />concerning the Grand Mesa Reservoir Company. Please refer to page 5 of that memo <br />and to the section "Action taken by the CWCB September 22, 2003." <br />When the Board approves a Small Project Loan from the Construction Fund there remain <br />several conditions: <br />a) A Feasibility Studv must be com lep ted" We have reviewed the July 2003 study <br />titled Feasibility Study, Grand Mesa Reservoir Company, Outlet Projects, Grand <br />Mesa Reservoirs One & Nine, prepared by the Grand Mesa Reservoir Company <br />using technical information provided by the City of Grand Junction. Please <br />continue to work with John Van Sciver to update the report to include the <br />expanded scope of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.