Laserfiche WebLink
I <br />Reconnaissance Level Capital and Operation <br />and Maintenance Costs <br />With exception of the Green Mountain concept, which was <br />assumed to deliver 68,000 acre -feet per year (AFY) in a single <br />phase, reconnaissance level cost estimates were developed <br />for each of the concepts described above based on three <br />options: <br />• Option 1: delivery of 100,000 AFY constructed in a single <br />phase <br />• Option 2: delivery of 250,000 AFY constructed <br />in a single phase <br />• Option 3: delivery of 250,000 AFY constructed <br />with the first phase delivering 100,000 AFY and <br />the second phase delivering the remaining <br />150,000 AFY <br />Key elements for each water supply concept were <br />identified and evaluated using uniform assumptions <br />to determine infrastructure requirements and sizing <br />for the reconnaissance cost estimates. The <br />following key elements were considered for each <br />option water rights, firming storage, transmission <br />facilities (including pipelines, pump stations, and <br />tunnels), diversion structures, water treatment, <br />reuse, and engineering, legal and administrative <br />costs including permitting. <br />Figure 2 shows the summary of the reconnaissance <br />level capital costs for each of the concepts. The <br />range of capital costs for all of the concepts is <br />$840 million (Green Mountain) to $9.8 billion <br />(Flaming Gorge Option 3). Although the new supply <br />development concepts and agricultural transfer <br />concepts are similar in total capital costs for each of <br />the options, the relative percentages of <br />subcomponent capital costs vary. For the <br />agricultural transfer concepts, the majority of the <br />capital cost is comprised of water rights <br />acquisitions. For the new supply development <br />concepts, the majority of the capital costs are <br />associated with pipeline and pump stations. <br />Operation and maintenance costs for each concept <br />are summarized in Figure 3. Reconnaissance level <br />annual operation maintenance range from <br />$29 million per year (Green Mountain )to $273 million per year <br />(Arkansas Option 3). The variability between concepts is due <br />primarily to conveyance costs but differences between <br />conventional treatment (Yampa, Blue Mesa, Green Mountain, <br />and Flaming Gorge) and reverse osmosis with zero liquid <br />discharge (South Platte and Arkansas) also contribute to the <br />variation. <br />FIGURE 2. SUMMARY OF RECONNAISSANCE CAPITAL COSTS <br />$10 <br />$9 <br />$8 <br />$2 <br />$6 <br />s $5 <br />n <br />u $ <br />n $3 <br />$2 <br />$1 <br />$0 <br />FIGURE 3. SUMMARY OF RECONNAISSANCE O&M COSTS <br />$300 <br />$250 <br />$200 <br />n $1s0 <br />3 <br />0 <br />0 <br />sloo <br />$so <br />$0 <br />Yampa South Platte 1 South Platte 2 Arkansas 1 Arkansas 2 Flaming Gorge Blue Mesa Green <br />Mountain <br />■ Onlion1: 100.00CArly 60.300Ar /yrfor Greco bloupla n a Opaon 2:250.0GOArlyr- Shrpk Piave ■ Opaar 3: 250,GGoAr!11 -2 Phan, <br />Yampa South Plane 1 South Platte 2 Arkansas 1 Arkansas 2 Fleming Gorge Blue Mesa Green <br />Mountain <br />■Onl on 1:100.000ArNr- C8.G00Arly for Green Mo—uir ■OOlior 2: 250.000Ar /vr- Sirele Phase 0O0-3: 250.000Ar!'yr- 2 Phase, <br />