My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150089 approval letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150089 approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:18:33 PM
Creation date
8/16/2010 1:14:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150089
CT2015-048
Contractor Name
Owl Creek Reservoir Company
Contract Type
Loan
Water District
1
County
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STAT� OF COLC�I�DO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />�wvw. cwcb. state. co. u s <br />December 7, 2001 <br />1VIr. J. Moody <br />Owl Creek Reservoir Company <br />P.O. Box 210 <br />Eaton, CO 80615 <br />Re: Owl Creek Reservoir Rehabilitation Project - Construction Fund Loan Approval <br />Dear Mr. Moody, <br />. _ _ �► <br />�;; <br />•--�•��.�. � J• <br />��� . � <br />��-- <br />Biil Owens <br />Governor <br />Greg E. Walcher <br />Fxecutive Diredor <br />Rod Kuharich <br />CWCB Diredor <br />Dan McAuliffe <br />Deputy Director <br />I am pleased to inform you that the Colorado Water Conservation Board approved <br />your Construction Fund Loan request on November 20, 2001. The loan is for the <br />rehabilitation of the Owl Creek Reservoir. <br />The Board approved the Construction Fund Loan in a maximum amount <br />$1,125,000. The loan terms are 2.75% for 30 years. I have attached a copy of the <br />updated Board memo concerning Owl Creek Reservoir Company. Please refer to page 6 <br />of that memo and to the Section "Action taken by the CWCB November 20, 2001 ". <br />The Board's approval was based on the Owl Creek Reservoir Company meeting <br />the following conditions: <br />1. A Feasibilit� is required, Tim Feehan has reviewed the study titled <br />"Feasibility Study Owl Creek Reservoir", prepared by the Colorado Water <br />Conservation Board. The report meets the requirements of the CWCB <br />Construction Fund Guidelines for feasibility studies. <br />2. An approved contract must be in-place before funds can be advanced. Jan <br />Illian will be contacting you to initiate the loan contract process in the near <br />future. Our goal is to have a loan contract signed by all parties by June 2002, <br />that is when all loan funds for 2002 are approved for disbursement by the <br />Colorado State Legislature. <br />Flood Protection • Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection + Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.