My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150089 approval letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150089 approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:18:33 PM
Creation date
8/16/2010 1:14:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150089
CT2015-048
Contractor Name
Owl Creek Reservoir Company
Contract Type
Loan
Water District
1
County
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Owl Creek Reservoir Company Agenda Item 26b <br />Loan Increase March 17, 2004 <br />granular material that over the years suffered structural damage due to seepage. In 1983 sand boils <br />appeared along the toe of the dam giving evidence that piping was occurring along the <br />dam embankment. Given the condition of the dam embankment and the potential for failure, the dam <br />was intentionally breached in 1983. <br />FEASIBILITY STUDIES <br />In November of 2001, the Company provided a feasibility report to the Colorado Water Conservation <br />Board, prepared by Applegate Group and CWCB staff, to rehabilitate the existing reservoir to a capacity of <br />1,200 acre-feet and to reconstruct the dam embankment and spillway. The feasibility study has been <br />updated to reflect a revised storage capacity of 1,750 acre-feet, design modifications, construction cost <br />based on actual bid results, and a revised financial analysis. <br />WATER RIGHTS <br />Runoff generated from the upper Owl Creek 160 square mile basin is the source of water for the Owl <br />Creek Reservoir. Currently, Owl Creek Reservoir Company owns 30,010 shazes of water rights on Owl <br />Creek, under two separate decrees, as summarized below in Table 1. <br />Table 1. - Water Rights 5ummary <br />Priority Date Priority No. Amount (Acre-feet) <br />November 21, 1895 9 643 Refill Ri ts) <br />January 15, 1914 (Enlar ement) 15 1,107 <br />Total: 1, 750 Acre- eet <br />These water rights allow the Owl Creek Reservoir Company to capture all surface, flood, waste, storm, <br />seepage, and percolation water that originate in the upper basin that flows directly into Owl Creek <br />Reservoir. The Owl Creek Reservoir Company does have sufficient water rights to fill the reservoir on <br />an annual basis. <br />PROJECT DESCRIPTION <br />The original project, as approved by the CWCB in November of 2001, was formally bid in May of 2003. <br />The bid packet was developed to obtain a base bid for construction of the dam embankxnent, outlet <br />structure, spillway, and other miscellaneous items, and to require the Contractors to submit alternate <br />bids for dredging, spillway modifications, and grading. The alternate bid for dredging involved the <br />removal of 1,666,500 cubic yards to achieve the full 1,750 acre-feet of storage. It was the intent of the <br />owner to review the bids received and determine what level of proj ect was most beneficial for the <br />Company to undertake. <br />The Company received bids from four qualified Contractors, the low bidder being R.E. Monk, from <br />Colorado Springs, Colorado at $2,499,923. Based on the bids received, the Company was left with <br />three possible alternatives, described as follows: <br />Reconstruct existing dam embankment, construct new outlet structure and spillway and keep <br />reservoir at existing capacity of 800 acre-feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.