My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engineering Feasibility of Long Draw Reservoir Enlargement
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Engineering Feasibility of Long Draw Reservoir Enlargement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2010 11:37:10 AM
Creation date
8/9/2010 2:28:57 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Long Draw Reservoir Enlargement; Small Reclamation Projects; Fort Collins
State
CO
Basin
South Platte
Water Division
1
Date
7/20/1966
Author
Wright-McLaughlin Engineers, Woodward-Clyde-Sherard and Associates, Water Supply & Storage Company Fort Collins, Kenneth R. Wright, William A. Clevenger
Title
Engineering Feasibility of Long Draw Reservoir Enlargement
Water Supply Pro - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IV. PRELIMINARY COST ESTIMATE <br />We have made, we believe, a reasonably conservative estimate of the <br />cost of the work necessary to enlarge the reservoir sufficiently to provide <br />6,400 acre feet of additional storage. Drawings No. 1 and No. 2 show prelimi- <br />nary designs for the major features needing modification. The tabulation <br />below indicates the estimate of cost for each feature, and the total estimated <br />cost of the enlargement. <br />LONG DRAW RESERVOIR <br />PRELIMINARY COST <br />ESTIMATE <br />- <br />Item <br />Unit <br />Quantit <br />Unit Cost <br />Cost <br />1. <br />Foundation stripping <br />Cu. Yds. <br />15,000 <br />$ 1.50 <br />$22,500.00 <br />• <br />and excavation <br />2. <br />Sand - gravel underdrain <br />Cu. Yds. <br />5,100 <br />3.00 <br />15,300.00 <br />3. <br />Rock Toe <br />Cu. Yds. <br />1,400 <br />4.00 <br />5,600.00 <br />4. <br />Excavation and place- <br />Cu. Yds. <br />211,000 <br />0.70 <br />147,700.00 <br />ment in dam embankment <br />5. <br />Riprap Filter (611) <br />Cu. Yds. <br />1,800 <br />3.00 <br />5,400.00 <br />6. <br />Riprap (18 '') <br />Cu. Yds. <br />5,400 <br />5.00 <br />27,000.00 <br />7. <br />Extension of outlet <br />Each <br />1 <br />20,000.00 <br />20,000.00 <br />work (90') <br />8. <br />Seal existing shaft <br />Each <br />1 <br />2,500.00 <br />2,500.00 <br />9. <br />Reservoir Clearing <br />Acres <br />25 <br />600.00 <br />15,000.00 <br />10. <br />Outlet tubes repair <br />Estimate <br />1 <br />10,000.00 <br />10,000.00 <br />11. <br />Outlet gate replacement <br />Estimate <br />1 <br />11,600.00 <br />11,600.00 <br />12. <br />Emergency Spillway <br />Estimate <br />1 <br />22,500.00 <br />22,500.00 <br />13. <br />Aerial surveys and <br />Estimate <br />1 <br />6,500.00 <br />6,500.00 <br />investigations <br />14. <br />Forest Service right <br />Estimate <br />1 <br />1,200.00 <br />1,200.00 <br />of way maps <br />15. <br />Engineering (includ- <br />Estimate <br />1 <br />37,000.00 <br />37,000.00 <br />ing supervision) <br />16. <br />Contingencies <br />Estimate <br />1 <br />50,000.00 <br />50,000.00 <br />TOTAL <br />$405,100.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.