My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engineering Feasibility of Long Draw Reservoir Enlargement
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Engineering Feasibility of Long Draw Reservoir Enlargement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2010 11:37:10 AM
Creation date
8/9/2010 2:28:57 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Long Draw Reservoir Enlargement; Small Reclamation Projects; Fort Collins
State
CO
Basin
South Platte
Water Division
1
Date
7/20/1966
Author
Wright-McLaughlin Engineers, Woodward-Clyde-Sherard and Associates, Water Supply & Storage Company Fort Collins, Kenneth R. Wright, William A. Clevenger
Title
Engineering Feasibility of Long Draw Reservoir Enlargement
Water Supply Pro - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10075 <br />10065 <br />10055 <br />10045 <br />W <br />W <br />I <br />z <br />0 <br />W <br />• 10035 <br />10025 <br />8/12 <br />T. H. -3 <br />4/13 <br />17/12 10 5/12 <br />' I � <br />10/12 4 <br />I <br />II <br />to 13/12 <br />I <br />23/12 <br />10/12 <br />T.H. -4 <br />to <br />5/12 <br />T.H. -5 <br />51/12 0 ^' <br />N <br />rr7m <br />T.H. -6 <br />0 <br />2 7/ 12 <br />• 10015 <br />-10005 <br />9995 <br />� 28/12 0 18/24 u 18/9 <br />0 MM <br />30/6 N O T E S <br />25/0 1. Test holes I thru 4, 8 and 9 were <br />drilled with a 4 -inch diameter helical <br />23 REFUSAL power auger, test holes 5 thru 7 were <br />drilled with a hand auger. Holes drilled <br />LJ on June 30 thru July I, 1966. <br />28/3 <br />2. Elevations are approximate. <br />3. Drill logs in this report are subject to <br />limitations, explanations and conclusions <br />of this report. <br />T.H. - 7 <br />10045 <br />o <br />LEGEND 10035 <br />© CLAY, soft, wet, sandy. <br />© CLAY, firm, sandy, gravelly. <br />10025 <br />% COBBLES, clayey, gravelly, dense. <br />SAND, dense, silty or clayey. <br />SAND, silty, soft wet. 10015 <br />PEAT or ORGANIC CLAY, soft, saturated. <br />o Free water level and number of days after drilling <br />that measurement was taken. <br />(0005 <br />r77 Approximate bottom of dam. <br />U.1 <br />W <br />UL <br />I <br />z <br />0 <br />a <br />W <br />w <br />WOODWARD -CLYDE - SHERARD <br />8 ASSOCIATES <br />Consulting Engineers Ek Geologists <br />Denver, Colorado <br />LOGS OF TEST HOLES <br />LONG DRAW RESERVOIR <br />Prepared by. DB lChecked by. FJ H <br />Job No. 9751 <br />DRAWING NO.3 <br />PERMEABILITY TEST <br />RESULTS <br />PACKING DATA <br />10075• <br />T. H.— I T <br />DRY <br />DRY APPLIED <br />PERMEABILITY <br />SAMPLE LOCATION <br />DENSITY MOISTURE <br />DENSITY <br />LOAD <br />RATE <br />PCF % <br />% <br />PSF <br />(FEET PER YEAR) <br />EXISTING BORROW AREA UP STREAM <br />128.5 9.9 <br />100.0 <br />720 <br />0.137 <br />6/12 <br />OF SADDLE BETWEEN DAM AND DIKE <br />EXISTING BORROW AREA DOWN STREAM <br />131.7 9.7 <br />100.0 <br />720 <br />0.032 T.H. -8 T.H.-9. 10065- <br />OF SADDLE BETWEEN DAM AND DIKE <br />1 <br />7/12 <br />ROAD CUT JUST N. W. OF EXISTING <br />88.7 26.5 <br />100.0 <br />720 <br />0.015 -- <br />TRAILER HOUSE <br />7/12 <br />LJ 10055- <br />10/12 <br />DRY AT DRILL <br />8/12 <br />T. H. -3 <br />4/13 <br />17/12 10 5/12 <br />' I � <br />10/12 4 <br />I <br />II <br />to 13/12 <br />I <br />23/12 <br />10/12 <br />T.H. -4 <br />to <br />5/12 <br />T.H. -5 <br />51/12 0 ^' <br />N <br />rr7m <br />T.H. -6 <br />0 <br />2 7/ 12 <br />• 10015 <br />-10005 <br />9995 <br />� 28/12 0 18/24 u 18/9 <br />0 MM <br />30/6 N O T E S <br />25/0 1. Test holes I thru 4, 8 and 9 were <br />drilled with a 4 -inch diameter helical <br />23 REFUSAL power auger, test holes 5 thru 7 were <br />drilled with a hand auger. Holes drilled <br />LJ on June 30 thru July I, 1966. <br />28/3 <br />2. Elevations are approximate. <br />3. Drill logs in this report are subject to <br />limitations, explanations and conclusions <br />of this report. <br />T.H. - 7 <br />10045 <br />o <br />LEGEND 10035 <br />© CLAY, soft, wet, sandy. <br />© CLAY, firm, sandy, gravelly. <br />10025 <br />% COBBLES, clayey, gravelly, dense. <br />SAND, dense, silty or clayey. <br />SAND, silty, soft wet. 10015 <br />PEAT or ORGANIC CLAY, soft, saturated. <br />o Free water level and number of days after drilling <br />that measurement was taken. <br />(0005 <br />r77 Approximate bottom of dam. <br />U.1 <br />W <br />UL <br />I <br />z <br />0 <br />a <br />W <br />w <br />WOODWARD -CLYDE - SHERARD <br />8 ASSOCIATES <br />Consulting Engineers Ek Geologists <br />Denver, Colorado <br />LOGS OF TEST HOLES <br />LONG DRAW RESERVOIR <br />Prepared by. DB lChecked by. FJ H <br />Job No. 9751 <br />DRAWING NO.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.