My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Feasibility Report of Proposed Watershed Program: McCracken Draw
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Feasibility Report of Proposed Watershed Program: McCracken Draw
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2010 11:40:40 AM
Creation date
8/9/2010 1:57:55 PM
Metadata
Fields
Template:
Water Supply Protection
Description
McCracken Draw Watershed near Crook, Colorado
State
CO
Basin
South Platte
Water Division
1
Date
6/1/1961
Author
Logan County
Title
Feasibility Report of Proposed Watershed Program: McCracken Draw
Water Supply Pro - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 6 - AMMUAL COSTS <br />McCracken Draw Watershed, Colorado <br />Measu <br />Amortization Of <br />Installation Costs V- <br />Oration and 21 <br />Maintena Cos ts <br />Total <br />Average <br />Annual Costi <br />P. L 566 <br />Other <br />Total <br />Othor <br />Evaluation Unit I <br />(McCracken Drava <br />Floodwater-Retarding <br />Structure MD-1 <br />2,869 <br />128 <br />2,997 <br />389 <br />3,386 <br />Floodtray MD-W -1 <br />3,793 <br />133 <br />3,926 <br />857 <br />4,783 <br />Subtotal <br />6,662 <br />261 <br />6,923 <br />1,246 <br />8,169 <br />Eva? uati on Unit II <br />West Drainage and <br />Duce Cre&,) <br />Fl o odurat er -Re Rardi. ng <br />Structur© MD-2 <br />857 <br />38 <br />895 <br />116 <br />1,011 <br />Diversion MD-2 Div. <br />95 <br />9 <br />105 <br />22 <br />127 <br />Subtotal <br />953 <br />47 <br />1,000 <br />138 <br />1.138 <br />TOTAL <br />7,615 <br />308 <br />7,923 <br />1,384 <br />9,307 <br />3/ Installation Costs are based upon current, construction costs - Amortized at <br />2 5/81 for 50 years (,,03614 amortization factor). <br />2/ Operation and Maintenance costs are based on long -torm projected prices` <br />
The URL can be used to link to this page
Your browser does not support the video tag.