My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Feasibility Report of Proposed Watershed Program: East Plum Creek Watershed
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Feasibility Report of Proposed Watershed Program: East Plum Creek Watershed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2010 12:58:51 PM
Creation date
8/6/2010 12:40:55 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Plum Creek Watershed
State
CO
Basin
South Platte
Water Division
1
Date
1/1/3000
Title
Feasibility Report of Proposed Watershed Program: East Plum Creek Watershed
Water Supply Pro - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Was than 19 pox went Q V in OU1117allon P i <br />estimate& that about 25 per cent of the total arwE in in VVIK and <br />Orush ow ahout 55 per non! W in ranCe, yasto=, and hay land <br />_)1 <br />IL"."IE <br />'The flociplins OR Hot plum Crack i <br />nabjQoLed to very sevare TUM during the ;,Q 100 yv,Y2, yrobvb# <br />duriAq the late UUM and eaKy WOO, This has rasulteti. in n ?ad <br />nal <br />ont=aohmeat unc', char_ 1 wid.u'Kng throughOM: <br />larger tributarion. As a result thare are PoW WWWY saki! are Ms <br />of cropland and Myland Wt Mthin M aynns Mincled to floodiag <br />or SoMant Mage <br />En or ay W obtain a reliable cstima o1 p0enhial QOWPQU� <br />damag3s, the Eallovdgg itumc were mappod on aarial ;Won (eigh <br />inches to one mile ecale)t (1) the areas oubject W flooding Ancludin <br />all staim ti. uencieu up to and including a anon in 100-y=r <br />occux{: once ) an East Plun Groch and its major Wbutnricsj (2) the land, <br />usa within these potential ovorHom ayeas; and (3) all bridges, roa(I <br />crossings, major gully hoadcuts, W other daniz-gea-ble <br />Mans, The areaa ndbject to flooding % measured and a tabulation <br />was prepared showing the various types W MU use Whin these <br />arew, <br />in addition to mapping potential Mange aroa.-;:, intorrvicw_7; were <br />conduated with officers and to -,ouncilmen of Qsklo Rock, husinesamen, <br />ranahexa, and agricultural technicians familiar with past and potential <br />damaga6 in tho watershed, <br />Tantativa gnReral locationa ok the most feasible dem site. were <br />selected and inspected in the Wwld„ it soon WcLmw Keay <br />that the feavibility of four floodwater-retarding Kructura Wtes <br />unuld be the deciding facior in an overall vaterzhed Program, Based <br />oa thn5e four site locaMons, Ve areao of reservoired and unseservoired <br />drainage were outlined and waaaured on U, Q Geolwical Survey <br />Lop3gwaphic xaps to make corMin that no feasible cuRbinatim.', <br />gTad. stabilization and structures i.xuld be olimniiatea <br />without evaluation, three 01 •0 moot Vvczable KOO for this type of <br />structure Vare soled ed Cnd ovaluated one location of all the Claivated. <br />structure nites an ) shown on VNe attached damago area and otructuve <br />site Map, <br />
The URL can be used to link to this page
Your browser does not support the video tag.