Laserfiche WebLink
TABLE OF CONTENTS <br />SUMMARY <br />Climate <br />CHAPTER I <br />- THE COMPANY <br />A. <br />Organization and Authority <br />B. <br />Financial Status <br />C. <br />Physical Assets <br />CHAPTER II <br />- PROJECT LANDS <br />B. <br />Climate <br />C. <br />Land Classifications <br />D. <br />Present Land Use <br />E. <br />Future Land Use <br />F. <br />Land Ownership <br />G. <br />Rights-of-Way <br />CHAPTER <br />III - WATER <br />A. <br />Water Rights <br />B. <br />Present Supply <br />C. <br />Water Requirements <br />D. <br />Proposed Storage and Reservoir Operation <br />E. <br />Possible Water Savings <br />F. <br />Quality of Water <br />G. <br />Sedimentation <br />CHAPTER <br />IV - PROJECT PLAN <br />A. <br />General <br />B. <br />The Dam <br />C. <br />The Reservoir <br />D. <br />The Outlet Works <br />E. <br />Spillway <br />F. <br />Halligan Dam <br />G. <br />Irrigation Structures <br />H. <br />Construction Designs and Estimates <br />CHAPTER <br />V - OPERATION AND MAINTENANCE <br />A. <br />Present <br />B. <br />Future <br />C. <br />Present Operation and Maintenance Costs <br />D. <br />Operation and Maintenance Costs of the <br />Proposed Project <br />Page <br />S -1 <br />I -1 <br />I -8 <br />I -17 <br />II -1 <br />II -2 <br />II -3 <br />II -5 <br />II -10 <br />II -12 <br />II -13 <br />III -1 <br />III -6 <br />III -1 1 <br />1I1 -13 <br />111- 16 <br />III -21 <br />III -21 <br />IV -1 <br />IV -2 <br />IV -6 <br />IV -8 <br />IV -12 <br />IV -14 <br />IV -15 <br />IV -16 <br />V -1 <br />V -3 <br />V-4 <br />v -6 <br />1 <br />