My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Field Examination Report Proposed Weldona Valley WP Project
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Field Examination Report Proposed Weldona Valley WP Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2010 10:57:49 AM
Creation date
8/4/2010 4:08:56 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Weldona Valley
State
CO
Basin
South Platte
Water Division
1
Date
1/9/1956
Author
Ed AMson, Cliff Van Dorn, Will McCorkle, Art Eustis, Bob Evans, Fred Boydsten
Title
Field Examination Report Proposed Weldona Valley WP Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'• 1 - <br />6 - <br />Under the nets SM lair a portion of a district coiild vote to raise <br />funds ITj taxation of the bersefiti.ng portions of the District. <br />Present indioat:ions are tcct there krill bo to diffict tty encountered <br />In obtaining easer_dnts m-:d rights -cf-why, ndditiaznz1 crodit facili- <br />ties needed might be obt thr ou h t`.e FTIA. <br />11. Estimated Time to Ccmpleto Project. <br />Prior to the formation of the soil conservation district there havo <br />boon approximately 35 stock t„:nY -a hilt on the watershed and come <br />areso show indications of good range mcnaZ=, ent. However, a completo <br />pro, ram of land treatment will hove to be planned and spzadod up in <br />application if a .mcccD --f project is to be carried on. <br />The needed structural mcamares could be installed in a relatively <br />short period of time but installaticn of theso rreazuros is dependent <br />upon th© progress of the land troatment. <br />12. S= nary. <br />Following a quick reconnaissance of the project area and after <br />interviewing local sponsors and farr:crs and r anehars, it appears that <br />the proposed project is physically and economicel.ly feasible under the <br />provisions of Fublic Law 566. <br />The party racc=onds that the United States .Bureaux of Recl.aratioa bo <br />consulted as to the present status of the rI'Iarrows Dam" before any <br />further steps are taken. <br />
The URL can be used to link to this page
Your browser does not support the video tag.