Laserfiche WebLink
I r <br />TABLE 8 - BENEFIT COST ANALYSIS <br />West Cherry Creek ;watershed, Colorado <br />(Dollars) 1/ <br />Meas ures <br />r 1 <br />Structures Nos., <br />la, lb, lc, 2, 2a, <br />3, 3a 4, 5, 5a, & <br />6• 2 7 0 3 , 10 7 3, 28 121 7,181 4,925 1.46 <br />Construction Unit 2 <br />Structures Nos., 7, <br />8 1 9, 10 & 11. 4,482 1,?31 4,160 449 279 11,101 7 1.51 <br />GRAIM TOTAL 4,752 4.1 838 7,815 177 boo 18 3 282 12, 294 1.49 <br />1/ Price Base: Benefits - Long -ter prices Does not include primary benefits <br />Cost - 1,95b Prices on Cherry Creek downstream from the project. <br />Date: July, 1958 <br />N <br />i <br />