Laserfiche WebLink
TABLE 2 - ESTEVIATED STRUCTURE COST DISTRIBUTION <br />West Cherry Creek Watershed, Colorado <br />(Dollars) J <br />Structure Site <br />number or Name <br />P. L. 566 Installation <br />Costs <br />Oth r Installation Cost <br />Estimated <br />Total <br />12 <br />Instal ^ <br />Engin- l <br />Other <br />Total <br />Po L <br />Adm. Of <br />Con- <br />Ease- <br />ments <br />Total <br />Eng. <br />Est. <br />I Contin- <br />e ie <br />Est. <br />E - <br />Construction <br />Unit No. 1 <br />716 <br />1,166 <br />28,234 <br />12 <br />Combination Grade Stabilization and <br />Floodwater- <br />Retarding Structures <br />1 <br />18,533 <br />2,780 <br />21,313 <br />2,984 <br />2,771 <br />2 <br />8,533 <br />1,280 <br />9,813 <br />1,374 <br />1 <br />3 <br />9,520 <br />1,428 <br />10,948 <br />1,533 <br />1 <br />4 <br />13 <br />2 <br />15,857 <br />2,220 <br />2,061 <br />5 <br />10,088 <br />1,513 <br />11,601 <br />1,624 <br />1,508 <br />6 <br />7 <br />1,104 <br />8,462 <br />1,185 <br />1 <br />27,068 <br />450 <br />716 <br />1,166 <br />28,234 <br />12 <br />450 <br />394 <br />844 <br />13,307 <br />13,904 <br />450* <br />532 <br />982 <br />14,886 <br />20,138 <br />450 <br />532 <br />982 <br />21,120 <br />14 <br />450 <br />532 <br />982 <br />15,715 <br />10,747 <br />450 <br />486 <br />936 <br />11,683 <br />Stabilizing and Sediment <br />Control I;heasures <br />la <br />1 <br />235 <br />1,800 <br />252 <br />234 <br />2,286 <br />300 <br />130 <br />230 <br />2,516 <br />lb <br />2,191 <br />329 <br />2,520 <br />353 <br />327 <br />3 <br />100 <br />195 <br />295 <br />3,495 <br />le <br />2,502 <br />378 <br />2,880 <br />404 <br />374 <br />3,658 <br />100 <br />260 <br />360 <br />4 <br />2a <br />4,696 <br />704 <br />5,400 <br />756 <br />702 <br />6,858 <br />100 <br />260 <br />360 <br />7,218 <br />3a <br />2,191 <br />329 <br />2,520 <br />353 <br />327 <br />3 <br />100 <br />195 <br />295 <br />3 <br />5a <br />870 <br />130 <br />1,000 <br />140 <br />130 <br />1,270 <br />100 <br />65 <br />165 <br />1 <br />TOTAL <br />81,836 <br />12,278 <br />94,114 <br />13,178 <br />12 <br />119,525 <br />3,250 <br />4,297 <br />7 9 547 <br />127,072 <br />Construction Unit No. 2 <br />Floodwater- Retarding Structures <br />7 <br />38,414 <br />5,762 <br />44,176 <br />6,185 <br />5 <br />56,104 <br />450 <br />1,960 <br />2,410 <br />58 <br />9 <br />21,003 <br />3 <br />24 <br />3,381 <br />3,140 <br />30 <br />450 <br />716 <br />1,166 <br />31,840 <br />11 <br />36,451 <br />5,468 <br />41 <br />5,869 <br />5,449 <br />53 <br />450 <br />993 <br />1,443 <br />54,680 <br />Combination Grade Stabilization and <br />Floodwater-Retarding <br />Structures <br />8 <br />19,596 <br />2 <br />22,535 <br />3,155 <br />2 <br />28 <br />450 <br />532 <br />982 <br />29,601 <br />10 <br />7 <br />1,097 <br />8 <br />1,177 <br />1,093 <br />10,6" <br />450 <br />393 <br />843 <br />11,520 <br />TOTAL <br />122,774 <br />18 <br />141,190 <br />19 <br />18,354 <br />179 <br />2,2 <br />4,594 <br />6,844 <br />186 <br />GRP.ND TOTAL <br />204,6 10 <br />30,694 <br />235,304 <br />32,945 <br />30 2 587 <br />298,83 <br />5,500 <br />8,891 <br />14,391 <br />313,227 <br />Price Bade: 1958 Construction Costs Date: July, 1958 <br />M <br />