My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Report of Field Examination Proposed Cherry Creek Watershed Project
CWCB
>
Water Supply Protection
>
DayForward
>
4001-5000
>
Report of Field Examination Proposed Cherry Creek Watershed Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2010 3:02:47 PM
Creation date
8/4/2010 3:54:16 PM
Metadata
Fields
Template:
Water Supply Protection
Description
West Cherry Creek
State
CO
Basin
South Platte
Water Division
1
Date
5/6/1955
Author
USDA Soil Conservation Service
Title
Report of Field Examination Proposed Cherry Creek Watershed Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
that the actual area involved does not exceed 10,000 acres and other <br />sources, such as land use and cover type maps of Douglas and El Paso <br />Counties, seem to corroborate this opinion. <br />2. Ownership and Tenur. <br />The entire area of the proposed project (246,400 acres) is under private <br />control, being all owned or state school laxid under lease to <br />private operators with the exception of 150 acres of Federal land. The <br />actual area of state land is about six sections of land. <br />3. Watershed ProNgem <br />These are well covered it the application. This part -y also calls attention <br />to the fact that this area has had four years of drought which has intensified <br />existing problems of proper use of land, grass management, and forest manage- <br />ment. The present seagon is a continuation of moisture deficiency to date of <br />May 1, 19550 <br />4 o <br />Project Objectives <br />There are 199 operating units within the Cherry Creels SCD and 176 of these <br />are under cooperative agreement with the SCD and these cooperative agree- <br />ments cover 133,676 acres. (130,579 acres in basic agreements.) There are <br />about 15 operating un t. in the W Plum and W. Arapahoe SCD portions of the <br />watershed. Seven are under cooperative agreement. It is estimated that <br />about 40% of the needed conservation treatment on farms and ranches has been <br />carried out. <br />5 Effect of Praiect Outside the Watershed <br />The party recognizes that a majoi flood control dam was completed in 1950 <br />by the Army Engineers to protect the city of )Denver from floods originating <br />on this drainage. The north boundary line of this project comes within <br />about two miles of this dam. The maximum operating pool area of the dam <br />(185,000 acre feet) would inundate an estimated 200 to 300 acres within the <br />project area. It is pointed out that upstream flood prevention would reduce <br />the speed of sedimentation in this detention reservoir. At the same time <br />no claim of damage reduction below the dam can be masse. It appears that all <br />benefits except reduction of sedimentation and damage prevention to this dam <br />are locally identifiable within the boundaries of the project. <br />6. Other Programs E2r <br />. 2s= Conditions and bloods <br />Forest Service representatives Robert L. Dunstan and Jack 'McNutt accompanied <br />they Soil Conservation Service representatives one day of this trip for the <br />purpose of determining the problems on the forested land, the kind of forestry <br />meam=es which might be planned, and the extent the Forest Service might par- <br />ticipate in the program. No attempt was made to determine all of the measures <br />which will be needed nor exact quantities and costs. Most of the watershed <br />was covered and the information and recommendations fallow: <br />
The URL can be used to link to this page
Your browser does not support the video tag.