My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Work Outline Franktown-Parker Tributaries of Cherry Creek Watershed
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Work Outline Franktown-Parker Tributaries of Cherry Creek Watershed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2010 3:06:59 PM
Creation date
8/4/2010 3:51:46 PM
Metadata
Fields
Template:
Water Supply Protection
Description
West Cherry Creek
State
CO
Basin
South Platte
Water Division
1
Date
12/15/1958
Author
Kenneth Chalmers
Title
Work Outline Franktown-Parker Tributaries of Cherry Creek Watershed
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WOW OUTLI n <br />Frankt ova -Parker T rib�rt� o f �r <br />RI PANO amt Oawlas Bounties <br />State of Colorado <br />Doawn xar 1 5, 1958 <br />Frel.iwiautry invoatigattsons indioate that a feasible pra7joat <br />prrvrontion a kaa developal fat the Praaktoom»Parksr Watershod. Thar <br />l.00al. *rpaaii%atfa -. has boon t.nfo mod of this fa ►at daul "s tft ieat0d to . .t <br />wisnoo to proceed 'It7►th th development ? ai wat ershed work plan. Thz p " l.c <br />in w- aatlka* .has ljoeii prepared to qdide the de"IoP at of a work <br />aim to pressant matee of (?) the sack auk! intensity Of svxveys Ar:'. <br />ij,yestigatiule (3) roia.n —i.ap ae -id too t inpota, (A) a prop0a*1 sarbsdule F <br />^_oe►pla - U.-vi the plat avn !1) A prellrainary estimate cd tb►a P. L. 50, <br />an tW::iel cr.& -t d f the ra' — actura.1 vorks of improverAnt. <br />Geaaa f &I <br />nrigiz�al C?a*rry Crook Appliawt i on included 246,400 400 acres. W at <br />Mia ry :;r+osk, for Wktc, ae work: p1Kn haw mesa acampletod taxr3 amro"A jr-Jer <br />the original. awPlioation,. *axpxisss 31,360 aatrea. The northern or l:nosr <br />pox "a, comprising 1f, , 000 acres, all Sri AraPap OO CMUty, chide, v &s <br />iArlu40.1 i.r1 ULQ origir.-41 Application for Cherry Creak, is aiot inale;loA <br />in the nww applioation. The nex Applioation for Frankt Paxker Tributaries <br />of Cherry (reok covers 199, 0403, of which 15,140 acres Lie in 11 Paso C=nty <br />savi 183,900 acres 1is in ,Ooaglaa Cmiaty, <br />Thin work outline sp wifteally o mrs 10!,160 acres included in Aeta•t <br />Cherry, rry, AntelM*, Lake Aa14h, )hW*alrilla, sad liillOW tribaottaries tdtiCh <br />enter tb* main streen at Clmwry Crook alcove xrashtom. Prelials- y <br />investigatleas x.111 be moll, visdar *zirtinq mtkority, of rese"Lrgl <br />tributaries is Cherry Crook ut iek are insly ed is the App41001 M. <br />tributaries tatal 90,848 awoo sad Its in 94091" CONStp, lUM" tb* <br />plreliiainaary Invostila►tieat obum that a feastme pnrewma eat be dovelsped <br />f the 90,880 &Woo, this weak outline will be smneaded. <br />The atruataral plan will be formulated an the tributary ertterskodf <br />abwe Tr4aktows,, .After testinij to estbwte tke possibility of saeraeGuic <br />justifioration withit► the tributary are&*, the da4metrua routed offa0ts <br />(benefits) will be a+llotaated back to the struct-Ar'as within. 044h tr3.ims4:Ary <br />area. <br />Work Plan ale" l ow L In the aaat aaar ed Will J"Gl ve the f of l ew.t ntj <br />typef of inytatileatio"% <br />Ty 11 •- Lett St abil i&ht t eta W1th t#ragaid Moir' Effect <br />Ty1,* 11 .., .. terflete Ccraskrol for FIa : Provmiion <br />
The URL can be used to link to this page
Your browser does not support the video tag.