Laserfiche WebLink
SAE <br />With assistance from the SCS Engineering and Watershed Planning Unit, <br />Colorado A & M College, and the Production Economics Research Branch of <br />ARS, periodically a summary of benefits and costs from works of improve- <br />ment will be prepared for each independently evaluated single or group of <br />" A " measures installed and for the "B" measures as a whole. This informa- <br />tion will be put in report form for use by the State Conservationist and for <br />submission to Washington. <br />k <br />EVALUATION COST <br />With added instrumentation and observations as recommended by the several <br />technical committees making functional inspection and as authorized by the <br />Administrator, the revised costs of evaluation during the life of the <br />project are estimated in the following tables. <br />First Year (Fiscal Year 1955) <br />Cost and Installation of Instruments <br />l/ <br />4 <br />;recording rain gages by Weather Bureau <br />S5 960.00 <br />l/ <br />10 <br />Standard rain gages by Weather Bureau <br />630.00 <br />1 <br />1 <br />stream gaging station by USGS <br />1,500.00 <br />5 <br />water stage recorders by USGS <br />2 �OO..00 <br />x $5,590.00 <br />Op and Ma <br />4 Recording rain gages by Weather Bureau) 450.00 <br />10 Standard rain gages by Weather Bureau ) <br />1 Stream gage by USGS 500.00 <br />0 550.00 5 _Q2 <br />Total Fiscal Year 1955 S�6,540.00 <br />1/ Now installed <br />Two of five now installed <br />