E
<br />TABLE 2
<br />KIOWA CREEK, COLORADO STATUS OF CONSERVATION JOB IN THE WATERSHED
<br />: TOTAL CONSERVATION JOB APPLIED TO DATE :TO LE APPL
<br />EASURES Ln :No U Total Cost :No Unit. Fed.Cost Idon -Fe .Cost Total Cost N o. Un
<br />os -
<br />A XEAS U .US
<br />4713,044
<br />Floodwater Retarding Structures
<br />No.
<br />Stab. & Sed. Control Structures
<br />Sao.
<br />Channel Improvement
<br />L.F.
<br />TOTAL A ;r:EASURES
<br />B L AS uRES
<br />Pasture & Range Seeding
<br />A.
<br />Contour Furrowing
<br />A.
<br />Structures, Erosion Control
<br />No.
<br />Livestock ir'iater Ponds
<br />No.
<br />Range Improvement
<br />A.
<br />Woodland 1.1anage ent
<br />A.
<br />Fencing
<br />Ini .
<br />Terraces
<br />Ki.
<br />Field Diversions
<br />IIi.
<br />Waterway Development
<br />A.
<br />Contour Farming, Stubble
<br />48,100
<br />t«ulching, Strip Cropping
<br />A.
<br />Technical Services, SCS B I
<br />7,260
<br />TOTAL B �bE.A.SUR.ES
<br />10,500
<br />TOTAL A w R :EASLRES
<br />7,740
<br />FAC ILI FLAT ING :fEASIORES
<br />18,800
<br />Program Evaluation
<br />250
<br />'°ork klan Development (SCS)
<br />1,500
<br />;cork Plan Development (FS)
<br />133
<br />Sponsor Services
<br />98
<br />TOTAL FACILITATING 1-ihASLAZ8
<br />32,530
<br />GOl-NG PkOGMUL (SCS)
<br />35
<br />CR) ING PRO GRAi (EXT )
<br />77,000
<br />G'FJil - M TOTAL
<br />69
<br />4713,044
<br />1
<br />2,500
<br />2,500
<br />68
<br />50
<br />46,080
<br />50
<br />29,200
<br />28,320
<br />4,200
<br />3,230
<br />4,270
<br />7,50
<br />25,000
<br />w787,444
<br />43,230
<br />tir6,770
<br />X10,000
<br />13,000
<br />195,000
<br />3,210
<br />6,700
<br />41,400
<br />48,100
<br />9,790
<br />15,000
<br />30
<br />7,260
<br />4,000
<br />10,500
<br />14,500
<br />7,740
<br />1,250
<br />18,800
<br />100
<br />250
<br />1,250
<br />1,500
<br />1,150
<br />133
<br />53,200
<br />98
<br />6,670
<br />32,530
<br />39,200
<br />35
<br />70,000
<br />77,000
<br />70,000
<br />1 0,000
<br />20,000
<br />10,000
<br />100
<br />40,000
<br />25
<br />10,000
<br />10,000
<br />75
<br />65
<br />6
<br />5
<br />165
<br />335
<br />500
<br />60
<br />65
<br />26,000
<br />5
<br />585
<br />1,415
<br />2,000
<br />60
<br />500
<br />15,000
<br />30
<br />900
<br />900
<br />470
<br />5,000
<br />10,000
<br />1,000
<br />2,000
<br />2,000
<br />4,000
<br />15,000
<br />X506,500
<br />X18,370
<br />;100,330
<br />A18,T00
<br />4x1,293,944
<br />21,600
<br />107,100
<br />128,700
<br />41,500
<br />23,101
<br />1,809
<br />5,000
<br />71,410
<br />61,160
<br />25,160
<br />25,160
<br />5,000
<br />�1, 431, 514
<br />446,760
<br />4107,100
<br />� 153, 860
<br />Total Extimated Cost excluding Program evaluation 4:1,390,014
<br />
|