My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150311 feas study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150311 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:18:25 PM
Creation date
8/4/2010 11:11:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150311
Contractor Name
Grand River Ditch Company
Contract Type
Loan
Water District
39
County
Garfield
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
II I ' <br />' <br />, <br />' <br />� <br />' <br />� <br />Project Description and Alternatives <br />The purpose of this project is to provide a means for the Grand River Ditch Company to <br />continue providing irrigation water to shareholders while minimizing the occurrence of future <br />failures of their diversion structure. Three alternatives were considered: <br />1. The no-action alternative. <br />2. Reconstruct the Rock work in river <br />3. Install Pipeline and Protective Rock in river <br />Alternative No. 1 was considered unacceptable since it means the Grand River Ditch Company <br />could not deliver water to its shareholders. <br />Alternative No. 2 was ruled out because of the potential risk that rock work will fail in high <br />water and will continue to seep causing ditch failure. <br />Alternative No. 3 was selected, since it is considered to be the least costly reliable approach. <br />The se/ected alternative, Alternative No. 3, involves purchase and installation of 1320 ft. of <br />two (2) side-by-side plastic pipes up to 48 inch diameter. Pipe may be a size smaller after final <br />engineering. This also includes needed concrete and other structural needs and rock riprap. <br />The Garfield County Office of the Natural Resources Conservation Service (NRCS) is preparing <br />engineering designs and cost estimates for the project. Conceptual plans as prepared by the <br />NRCS are attached in the back pocket of this study. <br />' The estimated cost of the completed project is $538,000. The cost breakdown is summarized in <br />Table 1. The NRCS Preliminary Design report and detailed cost estimate are included in <br />Appendix D. <br /> I' <br /> I' <br /> I � <br /> I, <br />❑ <br />' <br />� <br />' <br />Table 1. Grand River Ditch Company — Irrigation Pipeline Project - Cost Estimate <br />Estimated Budget: <br />Mobilization <br />Earthwork to banks <br />Concrete Headwall 10 CY <br />Pipeline 1320 ft using 2 48 in. pipes <br />Install Pipe <br />Rock Rip Rap <br />15% engineering and contingencies permits <br />$5,000.00 <br />$20,000.00 <br />$15,000.00 <br />$240,000.00 <br />$95,000.00 <br />$75,000.00 <br />$68,000.00 <br />Total <br />$538,000.00 <br /> I ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.