C150311 approval ltr
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150311 approval ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:18:25 PM
Creation date
8/4/2010 10:54:10 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150311
Contractor Name
Grand River Ditch Company
Contract Type
Loan
Water District
39
County
Garfield
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Grand River Ditch Company <br />July 9, 2010 (Updated July 30, 2010) <br />Page 3 of 5 <br />Project Description <br />Agenda Item Sb <br />The Project will allow the Grand River Ditch Company to continue providing irrigation water to <br />shareholders while minimizing the occurrence of future failures of their diversion structure. Three <br />alternatives were considered: <br />Alternative No. 1- No-action was considered unacceptable because it would mean the Grand River <br />Ditch Company could not deliver water to its shareholders. <br />Alternative No. 2- Reconstruct the rock work in the river was ruled out because of the potential <br />risk that rock work will fail in high water and will continue to seep and cause ditch failure. <br />Alternative No. 3(Selected) - Install pipeline and protective rock in the river was selected because <br />it is considered to be the least costly reliable approach. This alternative involves the purchase and <br />installation of 1,320 ft of twin 48- inch diameter parallel pipes. Final engineering may determine a <br />reduction in pipe size. Structural concrete, earthwork and rock riprap will also be needed. The <br />Garfield County Office of the NRCS is preparing engineering design for the Project. <br />Project Cost Estimate <br />Mobilization <br />Earthwork to banks <br />Concrete Headwall 10 CY <br />48" Pipe (2) 1320 ft <br />Install Pipe <br />Rock Rip Rap <br />Engineering <br />Contingencies/permits <br />$5,000 <br />$20,000 <br />$15,000 <br />$240,000 <br />$95,000 <br />$75,000 <br />$68,000 <br />20 000 <br />Total <br />$538,000 <br />The NRCS expects final design to be completed by September 2010 and construction to begin <br />October 2010. ' <br />Financial Analysis <br />Table 1 shows a summary of the funding sources for the Project. The total estimated cost of the <br />Project is $538,000. An initial loan phase (during construction) amount is based on 100% of the <br />estimated total Project cost (allowed per Policy #11). The loan will be reduced to $438,000 or less <br />after the Project is complete and the Borrower receives funds from the NRCS. The Company has <br />applied to the Colorado River Basin Roundtable for two WSRA grants. The Company received <br />approval for $25,000 from the Basin Fund and $175,000 from the Statewide Fund at the July BRT <br />meeting. These WSRA grant requests will be considered at the 3�} September CWCB meeting. <br />CWCB Staff has not included these grants in the financial analysis. <br />