Laserfiche WebLink
� <br />SECTION 6 - COLLATERAL <br />� <br />The collateral provided for this loan, as evidenced by the executed Security <br />Agreement, in the form attached as Appendix 4 and incorporated herein, shall be a <br />pledge of the Borrower's revenue assessments, as more particularly described in the <br />attached Security Agreement ("Collateral"). <br />SECTION 7— ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />No additional conditions or contract requirements <br />SECTION 8— CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BoRROwER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PRO�ECT. <br />B. The BORROWER and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications to <br />the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37-87-105 C.R.S., the BoRROwER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BoRROwER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BoRROwER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BoRROwER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER Shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PRO�ECT requires a resident inspector during <br />construction, the BoRROwER shall employ an inspector who has been approved by <br />the CWCB staff. <br />The BoRROwER shall construct the PRO�ECT in accordance with the approved plans <br />and specifications. <br />J. Upon completion of the PRO�ECT construction, the BoRROwER shall provide as-built <br />Appendix 1 to Loan Contract C150290 <br />Page 2 of 3 <br />