My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150260 contract docs
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150260 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2013 3:46:52 PM
Creation date
7/27/2010 2:00:17 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150260
Contractor Name
Republican River Water Conservation District
Contract Type
Loan
Water District
0
County
Lincoln
Logan
Sedgwick
Washington
Yuma
Phillips
Kit Carson
Bill Number
HB 08-1346
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />under this contract. <br />r� <br />U <br />14. OPERATION OF PROJECT. ThG BORROWER Shall without expense or legal liability to the <br />CWCB, manage, operate and maintain the PRO�ECT continuously in an efficient and <br />economical manner. <br />15. BORROWER Liability Insurance. <br />a. Because the BORROWER IS a"public entity" within the meaning of the Colorado <br />Governmental Immunity Act, CRS 24-10-101, et seq•, as amended ("Act"), the <br />BoRROwER shall at all times maintain such liability insurance, by commercial policy <br />or self-insurance as is necessary to meet its liabilities under the Act. <br />b. Prior to the disbursement of any loan funds, the BoRROwER shall provide the CWCB <br />with an Acord Form 25 or other form satisfactory to the CWCB evidencing said <br />insurance and shall provide the CWCB with documentation of renewals of said <br />insurance. <br />16. Additional Contract Requirements. Any additional contract requirements are set <br />forth in Additional Contract Requirement (Section 6) of the Project Summary. <br />B. PROJECT PROVISIONS <br />Construction Fund Program Procedures. During the completion of the PRO�ECT, the <br />BORROWER shall adhere to the CWCB Construction Fund Program Procedures <br />(Section 7) of the Project Summary. <br />2. Eligible Expenses. <br />loan disbursements <br />Summary. <br />The PRO�ECT expenses for which the BoRROwER is eligible for <br />are listed in Eligible Expenses (Section 8) of the Project <br />3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br />Disbursement Schedule (Section 9) of the Project Summary. <br />4. Time for Performance. The BoRROwER recognizes that time is of the essence in the <br />performance of all of its obligations under this contract. Therefore, the BoRROwER shall <br />complete the PRO�ECT within the time specified in Time for Performance (Section 11) of <br />the Project Summary. <br />5. Indemnification By The Construction Firm. The BORROWER shall require all <br />Construction Firms and their subcontractors to indemnify the STaTE and the BoRROwER <br />against all liability and loss, and against all claims and actions based upon or arising <br />out of damage or injury, including death, to persons or property, caused by any acts or <br />omissions of those parties or sustained in connection with the performance of any <br />contract related to the PRO�ECT or by conditions created thereby, or based upon any <br />violation of any statute, ordinance, or regulation, and the defense of any such claims or <br />actions. <br />6. Liability Insurance During Construction. During construction of the PRO�ECT, the <br />Loan Contract C150260 <br />Page 6 of t 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.