My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150194 contract docs
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150194 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2011 3:54:12 PM
Creation date
7/23/2010 12:06:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150194
Contractor Name
Central Colorado Water Conservancy District
Contract Type
Loan
Water District
2
County
Adams
Morgan
Weld
Bill Number
SB 05-084
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
with an Acord Form 27 or other fomn satisfactory to the CWCB evidencing said <br />insuranc� and shall provide the CWCB with documentatian of renewals of said <br />insurance. <br />15. Additional Contract Requirements. Any additional contract requirements are set <br />forth in Additional Contract Requirement (Section 6) of the Project Summary. <br />B. PROJECT PROVISIONS <br />1. Construction Fund Program Procedures. During the completion of the PRO�ECT, the <br />BoRROw�R shall adhere to the CWCB Construction Fund Program Procedures (Section <br />7) of the Praject Summary. <br />2. Eligible Expenses. The PRO�ECT expenses for which the BoRROwER is eligible for <br />loan disbursements are listed in Eligible Expenses (Section 8) of the Project <br />Summary. <br />3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br />Disbursement Schedule (Section 9) of the Project Summary. <br />4. Time for Performance. The BoRROVVER recognizes that time is of the essence in the <br />perFormance of all of its obligations under this contract. Therefore, the BoaROVUER shall <br />complete the PRO�ECr within the time specified in Time for Performance (Section 10) of <br />the Project Summary. <br />5. Indemnification By Th� Construction Firm. The BORROWER shall require all <br />Construction Firms and their subcontractors to indemnify the STarE and the BoRROwER <br />against all liability and loss, and against al) claims and actions based upon or arising out <br />of damage or injury, including death, to persons or property, caused by any acts or <br />omissions of those parties or sustained in connection with the performance of any <br />contract related to the PRO�ECT or by conditions created thereby, or based upon any <br />violation of any statute, ordinance, or regulation, and the defense of any such claims or <br />actions. <br />6. Liabitity Insurance During Construction. During construction of the PRO�ECT, the <br />BoRROwER shall require the construction firm(s) and any subcontractors to maintain the <br />following insuranoe coverage in the limits shawn during the term of their contracts for <br />the construction of the PRO�ECT. The BoRROwER shall provide the CWCB with an <br />Acord Form 27 evidencing said insurance prior to commencement of construction, <br />maintained until construction is complete, and shall provide the CWCB with <br />documentation of renewals of said insurance. No payments shall be made to the <br />BoRROVUEa unless all insurance certificates are current. <br />a. Builder's risk insurance for construction in progress for all perils of loss including fire, <br />wind, hail, and vandalism in an amount equal to the completed value of the <br />PROJECT. <br />b. Worker's compensation and employer's liability insurance in the required statutory <br />amounts. <br />c. Automobile liability insurance that includes coverage far all owned, non-owned and <br />Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.