Laserfiche WebLink
FORTED DURANGO RICD <br />Summary of Days RICD Request is Met or Not Met: <br />AVERAGE j ANNUAL VOLUME REQUESTED, KAF <br />based on 24 -hour administration of RICD water right <br />Original CWCB CWCB Proposal Randy <br />RICD Request Proposal with Trigger Proposal <br />344 323.5 296 300 <br />NOTES TO TED: <br />"CWCB Proposal with Trigger" refers to the current proposal as I understand it: <br />If the available water is less than 90% of the requested amount, the requested amount is dropped to <br />the next highest value in the table which is available (within 90 %). <br />If the available water is less than 175 cfs, the request remains at 175 cfs. <br />Dropping the requested amount when available flow is less than 175 cfs <br />would produce another decrease in anticipated days of call <br />even if the change in volume requested was small. <br />Details of water availability per year and per request period will be completed soon. <br />Original <br />CWCB <br />CWCB Proposal <br />Randy <br />RICD Request <br />Proposal <br />with Trigger <br />Proposal <br />DAYS NOT MET <br />9267 <br />7619 <br />5221 <br />6864 <br />DAYS MET <br />15918 <br />17566 <br />19964 <br />18321 <br />% DAYS MET <br />63% <br />70% <br />79% <br />73% <br />% DAYS CALLING <br />37% <br />30% <br />21% <br />27% <br />AVERAGE j ANNUAL VOLUME REQUESTED, KAF <br />based on 24 -hour administration of RICD water right <br />Original CWCB CWCB Proposal Randy <br />RICD Request Proposal with Trigger Proposal <br />344 323.5 296 300 <br />NOTES TO TED: <br />"CWCB Proposal with Trigger" refers to the current proposal as I understand it: <br />If the available water is less than 90% of the requested amount, the requested amount is dropped to <br />the next highest value in the table which is available (within 90 %). <br />If the available water is less than 175 cfs, the request remains at 175 cfs. <br />Dropping the requested amount when available flow is less than 175 cfs <br />would produce another decrease in anticipated days of call <br />even if the change in volume requested was small. <br />Details of water availability per year and per request period will be completed soon. <br />