Laserfiche WebLink
Sep 8 2006 <br />4:17PM <br />CITY OF DURANGO, COLORADO <br />Animas Basin Future Residential Development and Water Demand Study <br />September 2006 <br />Final Report <br />Prepared by: <br />1tP Inc. <br />Contact: Gabe Preston, Chief Author of this report, Gabe @rpiconsulting.org, 970 382 9886. <br />