Laserfiche WebLink
� <br />� <br />THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br />BORROWER: Bu�� CREEK RESERVOIR <br />CANAL 8� POWER COMPANY, a Coiorado <br />nonprofit corporation <br />By <br />irvin Jo son, President <br />84-0729190 <br />FEIN <br />(SEAL) <br />Attest � <br />, <br />�y " ^✓t/ ' � <br />J hn W.'G oo, Secretary-Treasurer <br />State of Colorado <br />Biii Ritter, Jr., Governor <br />By _ <br />For the Executive Director <br />Department of Natural Resources <br />Colorado Water Conservation Board <br />Rod Kuha�ich, Director <br />ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br />CRS 24-30-202 requires that the State Controller approve all state contracts. This <br />contract is not valid until the State Controiler, or such assistant as he may <br />delegate, has signed it The contractor is not authorized to begin performance <br />until the contract is signed and dated below. If performance begins prior to the <br />date below, the State of Colorado may not be obligated to pay for the goods and/or <br />services provided. <br />Leslie M. Shenefelt, State Controller <br />By � �� <br />Effective Date �' �'d� <br />Loan Contract C150240 <br />Page 11 of 11 <br />