Laserfiche WebLink
Mr. Norman Hunt, President <br />Silt Water Conservancy District <br />August 5, 2003 <br />Page 2 <br />b) An ap�rov d.ontra t m��t b in nlac� before funds can be advanced. Jan Illian <br />will contact you concerning our contracting procedure. It usually takes about 2.5 <br />months to complete the contract from the date the loan is approved by the CWCB. <br />c) Yo� m�st adh�r� to th� GWGB Design and Construction Administration <br />Procedures. Tim Feehan will contact you regarding the CWCB requirements <br />concerning project bidding, design, and construction. Tim will make construction <br />inspections, which will be the basis of the pay estimates for disbursement of your <br />loan funds. <br />On behalf of the Board, I would like to thank you for applying for a Small Project Loan <br />from the Colorado Water Conservation Board. <br />Sincerely, <br />� s/�� � �, <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br />Attachment: Updated Memo: SiItWCD703memo <br />Cc (w/attachment): Mr. Greg Hoskin, Colorado Water Conservation Board <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br />C:\Proj-New\SiItW CD703Ltr <br />