My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150243 Contract
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150243 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 11:57:12 AM
Creation date
7/21/2010 1:02:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150243
Contractor Name
Aurora, City of
Contract Type
Loan
Water District
0
County
Adams
Bill Number
SB 07-122
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P Y `' _ <br />a. At its January 2006 meeting, the CWCB approved a loan from the Construction Fund to <br />the BoRROwER in an amount up to $75,750,000 f01' PROJECT COStS, not to exceed 90% of <br />the cost of the PRO�ECT, including a loan origination fee of 1% of the amount of funds <br />disbursed for PRO�ECT costs in accordance with CWCB Policy No. 16, at an interest rate <br />of 3.75% per annum for a repayment term of 30 years. <br />b. Pursuant to Bill 07-122, the Colorado General Assembly authorized CWCB to loan <br />to the BoRROwER an amount up to $75,750,000 for the PRO�ECT. <br />7. Borrower has several outstanding long-term debts through its Utility Enterprise, <br />governed by its General Ordinance and applicable Series Ordinances, attached hereto <br />as Appendices 3-5. <br />8. This Contract and the Promissory Note issued hereunder were authorized by the City <br />pursuant to City Ordinance No. 2003-18, as amended by Ordinance 2003-70 <br />(collectively, the "General Ordinance"), attached hereto as Appendix 3, and <br />Ordinance No. 2007-30 (the "2007 CWCB Series Ordinance"), attached hereto as <br />Appendix 5. <br />9. The CWCB accepts the provisions of Borrower's General Ordinance and applicable <br />Series Ordinances which govern the Water Fund, as defined in the General <br />Ordinance, and its existing debt. This loan shall receive a second-lien priority on the <br />Water Fund's net revenues that will be on parity with existing and future second-lien <br />revenue obligations. <br />10. The CWCB desires to make a loan (the "Loan") to the Borrower for the Project upon <br />the terms and conditions stated herein. <br />11. This Contract is an intergovernmental contract and shall be so construed under the <br />Special Provisions provided herein. <br />DEFINITIONS <br />Capitalized terms used in this Loan Contract shall have the respective meanings <br />specified in the Factual Recitals hereto or in the General Ordinance. In addition, the <br />following terms shall have the following respective meanings: <br />1. "Construction Documents" means any construction contracts, construction <br />specifications, design specifications, and design plans. <br />2. "Debt Service Requirements" means the Debt Service Requirements of the Loan. <br />3. "Engineering Consultant" means Borrower's representative or employee responsible <br />for the creation of the Construction bocuments. <br />4. "Substantial Completion" means completion of the Project such that no further <br />disbursements of funds are necessary and the total disbursement amount is finalized <br />for repayment of the Loan. Loan repayment begins one year after the Substantial <br />Completion date. <br />Loan Contract C150243 <br />Page 2 of 15 <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.