Laserfiche WebLink
i <br />,t � � <br />a. Because the BORROWER IS a"public entity" within the meaning of the Colorado <br />Governmental Immunity Act, CRS 24-10-101, et seq., as amended ("Act"), the <br />BoRROwER shall at all times maintain such liability insurance, by commercial policy <br />or self-insurance as is necessary to meet its liabilities under the Act. <br />b. Prior to the disbursement of any loan funds, the BoRROwER shall provide the CWCB <br />with a form satisfactory to the CWCB evidencing said insurance and shall provide <br />the CWCB with documentation of renewals of said insurance. <br />16. Additional <br />analysis o1 <br />debt. <br />Contract Requirements. CWCB will allow inclusion of all tap fees in the <br />Borrower's Utility Enterprise revenues regarding parity testing on future <br />B. PROJECT PROVISIONS <br />1. Construction Fund Program Procedures. <br />a. The BoRROwER shall at all times maintain on the project an engineer, registered in <br />the state of Colorado, to prepare plans and specifications for the PRO�ECT. <br />b. Copies of the BORROWER's and the Engineering Consultant's plans and <br />specifications and any modifications thereto shall either be filed with the CWCB or <br />shall be kept available for inspection by the CWCB at BORROWER's office for <br />verification of compliance with the terms of this contract. <br />c. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br />§ 37-87-105 C.R.S., the BoRROwER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />d. Borrower shall give notice to CWCB representative of all bid openings and the <br />CWCB shall be allowed to attend such bid openings. <br />e. The BoRROwER shall Contract for the construction of the Project with responsible <br />and capable construction firms. <br />f. The BoRROwER shall file with the CWCB or make available for the CWCB's <br />inspection at BoRROwER's office a copy of the executed construction Contract <br />documents consisting of the Contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. <br />g. CWCB staff shall be apprised of all preconstruction conferences and weekly project <br />meetings with reasonable notice and shall be permitted to attend any Project <br />meeting or conference as requested (except BORROwER's City Council executive <br />sessions, executive negotiations or meetings with legal counsel). <br />h. The Borrower shall contract with qualified firms for all aspects of the project, <br />including, but not limited to, design, construction and construction management. <br />The Borrower shall contract with a qualified construction management firm, whose <br />Loan Contract C150243 <br />Page 7 of 15 <br />