My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Watershed Protection and Flood Protection Determining Priorities of Applications
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Watershed Protection and Flood Protection Determining Priorities of Applications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2010 11:48:20 AM
Creation date
7/21/2010 12:57:54 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Status of P.L. 566 Projects and Flood Control Schedules
State
CO
Date
1/1/3000
Title
Watershed Protection and Flood Protection Determining Priorities of Applications
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tera to be Cwmiderad <br />V . c a '. , <br />1. At 1ewt g PGVC nt of the Watershed szva ahead be in the flood p1taiu, the <br />majority of vh1ch should to cralUnd or mm8ov late subject to futum &od <br />reownd tg Magee. <br />2. H h act atlon / a y c = U m �� j � an f lac w ater y� ta am Q <br />structwmlly sound end wrating at the end of 90 Inrn pxw1ded adequate <br />nala wnswe is given. <br />0 <br />In jugieg edit rewibMty dawwas considered am general3q ' th o that <br />e" likely to occur fteqaaably and that an larzeip be prevented with the <br />Ft;`gWed prWam. D==ip velms and mat be realistic Arad acceptable to <br />"the sUrVW Party. <br />4. A lerg® poroiam or time &- .ague should occur' at 2 U 5 year inte In <br />order to rco substantsal avaxTMp annial daz a csstlmtea. <br />5. 130cause It la did` icult to ebtedn & squate Saswtwm1 sites i adiai oJly <br />asbm the priwipal dms&e are refteticm of damns by the strue b i s <br />aw na Ukely to weed 60 to '13 percent ar the tota recvw fig annv. ml -mrJON. <br />6. If O of the recu=luz es+n l & --mien can be parevented by a vatm <br />PrWM., a IVAtO y' 4aoo,4c* Of +mature MW be Justlf ed for th <br />Installation or the structural Progrm to sccevUs s this reducticn. %his <br />will give a favorable benQi'jt cost =Lto. <br />TS <br />Pwrequ sites <br />1 nton of P. L. 5fA, as awavhed: <br />1. Ball conservation disWier. or cowe:rvatlon agresmmts have been o'bWned fig <br />Owwra c, at learnt �ertS of the lam ebm each nMntlon or oar <br />rese�BS'. <br />a. Locma people have given aosurance that necesaua7 land sites, mate and <br />r3ahtis-af will be acgulred elth cmt to the federal. gMrrement <br />3. mat, ple have apeed to assua such proportion of costs as is detemalt ed <br />to 'tic° miltrttable for Purposes to be carried out other than Mod prewntlon,, <br />GUea M-0 :" Sgatior�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.