My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Watershed Protection and Flood Prevention: Status of Applications and Projects
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Watershed Protection and Flood Prevention: Status of Applications and Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2010 11:48:38 AM
Creation date
7/21/2010 12:54:07 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Status of P.L. 566 Projects and Flood Control Schedules
State
CO
Date
10/15/1967
Author
State Soil Conservation Board
Title
Watershed Protection and Flood Prevention: Status of Applications and Projects
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
} 4 - Watershed Protection and Flood Prevention - Status of Applications and Projects - October 15, 1967 - Colorado <br />Name of Watershed <br />County <br />Sponsor <br />c s <br />Present Status <br />390 Newell Lake <br />Larimer & <br />Big Thompson SCD <br />4,640 <br />Preliminary investigation suspended <br />[October, <br />Weld <br />1961. <br />40. Montezuma Valley <br />Dolores & <br />Dolores SCD <br />163,520 <br />Tabled. Clearance of the State Water <br />Montezuma <br />Conservation Board and USBR °involved, <br />41, Roatca Wash <br />Montrose <br />- Shavano SCD <br />11 <br />Project completed November 30 1965, <br />42, Limon <br />Lincoln & <br />High Plains SCD <br />9,796 <br />Project completed October 14, 1965. <br />Elbert <br />Town of Limon* <br />43. Louden <br />Larimer <br />Louden Irrigo Co. <br />20,000 <br />Construction began November 10, 1966, <br />Big Tho son SCD* <br />44, Sand Creek <br />Yuma <br />Hale SCD, Yuma <br />28,644 <br />Tabled, Not feasible, <br />Coun <br />45, Trinchera Creek <br />Las Animas, <br />Branson- Trinchera <br />44,800 <br />Preliminary investigation terminated <br />Colo., Colfax, <br />SCD, E. Colfax SCD <br />August, 1964. <br />New Mexico <br />46. W. Four Mile Creek <br />Park, Teller <br />Teller -Park SCD <br />56 <br />Preliminary investigation terminated <br />Au st 19648 Not feasible. <br />47. Left Hand Ditch <br />Boulder <br />Left Hand Ditch Co. <br />45,000 <br />Preliminary investigation suspended <br />Lon ont SCD <br />Haa i 19640 <br />48. Pine River <br />La Plata <br />Pine River Canal Co. <br />— <br />13,752 <br />Construction began August 23, 1966. <br />Archuleta <br />Pine River SCD <br />49. Morrison Consoli- <br />La Plata <br />Morrison Cons. Ditch <br />6,720 <br />Preliminary investigations terminated <br />dated Ditch Co. <br />Co. Pine River SCD <br />July 8 19660 <br />50. Pine River Bayfield <br />La Plata <br />Pine River Bayfield <br />2,000 <br />Preliminary investigations terminated <br />Ditch Company <br />Ditch Co., Pine <br />July 8, 1966. Not feasible, <br />River SCD <br />51. Evans <br />Weld <br />Platte Valle SCD <br />._ 37 .2 000-1 <br />Field examination held; <br />
The URL can be used to link to this page
Your browser does not support the video tag.