My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS-PL-566 West Paradox Preliminary Investigation Report
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
WS-PL-566 West Paradox Preliminary Investigation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2010 12:06:54 PM
Creation date
7/21/2010 10:59:32 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Paradox Valley - P.L. 566
State
CO
Basin
Gunnison
Water Division
4
Date
2/21/1966
Author
F.A. Mark, Ray C. McDaniel
Title
WS-PL-566 West Paradox Preliminary Investigation Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 - F. A. bark - FEbruary rl, 1966 <br />C. 9 E. goon C. banks, Regional Attorney, General Counsel's Office, wrote <br />an opinion to F. A. hark., dated June 11, 1963, statin Leda the Para( >cx <br />Valley Canal and Reservoir Coopany is a mutual non profit private <br />organization with perpetual existence. As such, it is qualified as <br />a sponsor under the requircine of Section 1103.1 of the atc rshFt.' <br />handbook. <br />On June 16 -17, 1965 F4 A personnel, P. t oecglund, Art P h i l l i p s and <br />Ed Swith. assisted in a reconnaissance of the watershed" accom anieu <br />bay Fred Rasm ussen, G. E. McCri.m and K. L. Carson of SC S. At that <br />time the FHA personnel Wl ieved that the Company was eligible and had <br />capabili for a loan repayment under Section 8 of the Watershed <br />Protection anu Floods Prevention Act. <br />D. Installed cunt hasee can preliw,i €nary estimates for the irrigation storage <br />enlargement of approximately 1600 acre feet to the tjucke,ye reservoir is <br />$10� ,CDO for a net capacity f f 3200 acre - feet , for irri;sation. The cost: <br />of the main diversion and canal anlargewent locator° above the reservoir <br />is estimatcci at W81,000 making a Lctal installer cost of $133,000. <br />The memorandum of November 2, 19G6 from C. Vii. Mitchell and A. U. Elkin <br />to F. A. Mark concurs in the preliminary estimates of V >uckeye Reservoir <br />enlargements as estimated by J. G. Odell, Part:y. Lngirseer. <br />An incredseo average water supply during the late season from additional <br />storage capacity will provide increased returns from a chance in the <br />crap, ?ing system. This is stireated at $9,00C annually. Costs of the <br />above installed structures witfl operation and maintenance is estimated <br />at $5,940 annually. The benefit-cost ratio is 1.54 to 1.0 . <br />Since the .pater distribution system is nut company -owned but belongs to the <br />individual landowners using the ditches, it is believed that any agricultural <br />rater management moveiiie.t will be provided by the application of Ian. - I treat- <br />ment measures with the assistan of the Sari tiicruel basin Soil Conservation <br />District an Ag ricultural Conservation Program cost - s (nau (:valuated <br />in this report). <br />In the opinion of the Colorado 'Water Conservation i,oard staff and ilte <br />atershed Planning staff the project is feasible. As propose< , the <br />construction cost of all proposed works of improvem nt will be approximately <br />$10F5,000 and as such would rewire Ac'ministrator and State Conservationist: <br />approvals. The addition of recreation would be well within the $4 <br />authorize {tin limitatiens, if included. <br />
The URL can be used to link to this page
Your browser does not support the video tag.