My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trinchera Watershed Work Outline
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Trinchera Watershed Work Outline
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 4:18:58 PM
Creation date
7/20/2010 3:34:08 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Trinchera Irrigation Company
State
CO
Basin
Rio Grande
Water Division
3
Date
6/29/1972
Author
Colorado State Conservationist
Title
Trinchera Watershed Work Outline
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WORK OUTLINE <br />Trinchera Watershed <br />a County, State of Colorado <br />June 1972 <br />Preliminary investigations, reported in the attached copy of a Watershed <br />Investigation Report, :indicate that a feasible project for Irrigation <br />Water Management can be developed for the Trinchera Watershed. The <br />sponsoring; local organizations have been informed of this fact and have <br />indicated that they wish to proceed with the development of a watershed <br />work plan. Mutual agreements have been reached on desired levels for <br />project development. <br />Level of Development - <br />Thz Trinchera Irrigation Company operates a system of two storage <br />reservoirs with delivery canals and laterals to farms. The parent <br />company was organized in 1907. <br />The agreed upon level of development consists of rehabilitation of the <br />system including lateral realignment and lining; headgates with <br />measuring flumes; road culverts and one pumping plant at Smith Reservoir. <br />The pumping plant will be used instead of replacing a 25 c.f.s wooden <br />flume. <br />The following work outline has been prepared to guide the development <br />of a work pArn- and environmental statement and to present estimates <br />of (1) the'scope and intensity of surveys and investigations, <br />(2) man -day and cost inputs, (3) a proposed schedule for completing the <br />plan and (4) a preliminary estimate of the PL -566, other, and total <br />cost of the structural works of improvement. <br />The following surveys, investigations, and analyses have been agreed <br />upon by the Service and other State and Federal agencies that will <br />participate in developing the watershed work plan.. <br />Vydrologic Engineering <br />Water supply - Water supply for reservoir storage and direct diversion <br />will be calculated from records of U.S.G.S., State of Colorado, and <br />Trinchera Irrigation Company. Supplemental water from wells will be <br />calculated from records of land operators and the Public Service <br />Company of Colorado. <br />
The URL can be used to link to this page
Your browser does not support the video tag.