V
<br />TABLE 3 -
<br />Estimated Structural Cost Dis- t^ibution
<br />Trinche-ra Irrigation: _'o.
<br />," tersi:ed,
<br />Colorado
<br />{ Vi c - , ors)
<br />Est.
<br />: Installation ^ ^_t
<br />.L. 566 :Ins Cost -Other Funds
<br />Total
<br />Constr.
<br />.Construe
<br />7- gi-
<br />Total .
<br />,,..__s =rum
<br />Land-
<br />Totai:
<br />Instal.
<br />Item
<br />Cost
<br />tion
<br />veering
<br />P.L. 566:
<br />-- _on
<br />ri4its
<br />Other:
<br />Cos`
<br />Newton Lateral
<br />121,240
<br />60,620
<br />16,970
<br />77,590
<br />60,620
<br />2,000
<br />62,62G
<br />140,210
<br />?arson -_cCee Lateral
<br />49,820
<br />24,910
<br />6,980
<br />31,890
<br />24,910
<br />1,000
<br />25,910
<br />57,8C0
<br />Lob ato- Escheman, Hayashida
<br />:
<br />Lateral
<br />55,220
<br />27,610
<br />7,730
<br />35,340
<br />27,610
<br />1
<br />28,610
<br />63,950
<br />Smith- Grim-cood Lateral
<br />28,300
<br />14,150
<br />3,960
<br />18,120
<br />14,150
<br />500
<br />14,650
<br />32,770
<br />Whitehead- Escleman Lateral
<br />30,960
<br />15,480
<br />4,330
<br />19,810
<br />15,480
<br />500
<br />15,980
<br />35,790
<br />Beam - diddle Lateral
<br />94,420
<br />47,210
<br />13,220
<br />60,430
<br />47
<br />2,000
<br />49,210
<br />109,640
<br />Sub -total
<br />379,960
<br />189,980
<br />53,190
<br />243,170
<br />189,980
<br />; 1 ,000
<br />196,980
<br />440,150
<br />S,mit- Reservoir Lateral
<br />109,280
<br />54,64'
<br />15,300
<br />69,34'
<br />54,640
<br />1,000
<br />55,640
<br />y25,580
<br />TOTAL,
<br />489,240
<br />244,620
<br />68,490
<br />313,110
<br />244,620
<br />8,000
<br />252,620
<br />565,730
<br />Project .-'1-nninistration
<br />78,280
<br />4,890
<br />83,170
<br />Total Installed Cost
<br />489,240
<br />244,620
<br />68,490
<br />391,390
<br />244,620
<br />8,000
<br />21257,510
<br />648,900
<br />1/ Price Base 1971
<br />2/ Road Culverts
<br />
|