My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150064 approval letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150064 approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2010 3:21:13 PM
Creation date
7/20/2010 1:32:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150064
Contractor Name
Western Area Power Administration, U.S. Department of Energy
Contract Type
Loan
Water District
0
County
Statewide
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />'Il <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />3 <br />� �� �I��1C tCl°I11 "C21�)lttll �)1'0,)(',CtS�� I11C�1,I1S �)121T1- <br />ning, desi�ri, permittin� or other compliarice, prc- <br />construction activities, constrllction, constructiori <br />mariagement, arid replacemcnt of facilities, and the <br />acquisition of interests in larid or water, as nec- <br />essary to carr�y otit the Recovery Implementa,tion <br />Programs. <br />(6) The ter•m "facilitics" iiiclndes f�LCilities for• <br />the g•erictic coiiserva,tiori or pi��pa�;�titioti of tlic eYi- <br />d�tin�;ered fi�hes, those for thc restor�ltioii of tlood- <br />plain habitat or fis�i pass�i�;c, thosc for coritrol or <br />sl�ppl,y of iristt�eam flows, arid those f�>r the reruoval <br />or transloc�ltioYi of Y���t�inativc fi5hcs. <br />(7) The terrn "interest� iti larid ancl w�ltcr" in- <br />ehlcles, but i� riot limited to, lon�-tern�i leases ancl <br />easemezits, ancl lon�-terni cnfoi•cemerit, or other <br />17 a�recments protcctin� instre�lm fl���vs. <br />18 (S) The term "base fi.lndirig" mcans funcling for <br />19 operation ancl maintenance of capital proj ects, im- <br />20 plemeritation of recovery actions other than capital <br />21 projects, monitorin� and research to evaluate the <br />22 need for or effectiveness of any recovery action, and <br />23 pro�mam mana�;ement, as neces�ary to carry out the <br />24 Recovery Implementation Prograins. Base funding <br />25 also inelucles annual fiinclin� provicled under the <br />� <br />� <br />• <br />•HR 2348 IH <br />
The URL can be used to link to this page
Your browser does not support the video tag.