Laserfiche WebLink
Table 4.1 (cont.) <br />Plan <br />r � <br />3.0 <br />Management Toots <br />Comment <br />C o s t <br />Estimate <br />($1,000) <br />3.1 <br />Statewide Area Network for Divisions 1, <br />Communication system required to <br />400 <br />2 and 3. <br />maintain a centralized data management <br />system. Funding for Divisions 4, 5, 6 & <br />7 is expected to be part of CRDSS. <br />3.2 _ <br />Implement a Statewide Database <br />All State data except wells were included <br />450 <br />(HydroBase) for all Divisions. Includes <br />as part of CRDSS in Divisions 4, 5, 6 & <br />water rights, diversions, well permits, <br />7 <br />dams & stock ponds <br />3.3 <br />Planning Tools for Divisions 1, 2 and 3. <br />Planning tools were developed as part of <br />1,100 <br />Include Consumptive Use, Water Rights <br />CRDSS in Divisions 4, 5, 6, & 7 and as <br />Planning and Ground Water. <br />part of the Kansas v. Colorado litigation <br />in Division 2. However, to use the tools <br />developed in the Kansas case would take <br />some refinement of the models to <br />maintain statewide consistency. <br />3.4 <br />Administration Tools for Divisions 2 and <br />An administration tool was developed for <br />300 _ <br />3 <br />Division 1 as part of the SPWRMS. <br />Administration tools are planned as part <br />of CRDSS in Divisions 4, 5, 6, & 7. <br />Total <br />(Includes approximately 15% for <br />6,400 <br />contingency, etc.) <br />