Laserfiche WebLink
[� <br /> � <br />1 <br />Conveyance B follows a path from the diversion to the reservoir in an open channel canal for its entire <br />� length , approximately 664,000 ft(125 mi). The conveyance route and profile for Conveyance B are <br />shown on Figure 3 on page 17. <br />' Based on the diversion elevation and the elevation of the normal water surface elevation of the reservoir <br />of 4990, for both reservoir capacities presented in Section III, the total elevation drop would be 95 feet. <br />The average slopes for the varying length alignments would be: 0.021% for Conveyance A and 0.014% <br />' for Conveyance B. Table 1 summarizes the lengths and the conveyance configuration for Conveyance <br />A. Conveyance B does not incorporate any flumes, siphons or tunnels and therefore is not described in a <br />similar table. <br />' <br />� <br />� <br />� <br />� <br /> I ' <br />' 15 <br />� AECOM <br />2/22/10 <br />� <br />