My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C154141 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C154141 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 1:43:04 PM
Creation date
7/16/2010 11:53:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C154141
Contractor Name
AECOM USA, Inc.
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
[� <br /> � <br />1 <br />Conveyance B follows a path from the diversion to the reservoir in an open channel canal for its entire <br />� length , approximately 664,000 ft(125 mi). The conveyance route and profile for Conveyance B are <br />shown on Figure 3 on page 17. <br />' Based on the diversion elevation and the elevation of the normal water surface elevation of the reservoir <br />of 4990, for both reservoir capacities presented in Section III, the total elevation drop would be 95 feet. <br />The average slopes for the varying length alignments would be: 0.021% for Conveyance A and 0.014% <br />' for Conveyance B. Table 1 summarizes the lengths and the conveyance configuration for Conveyance <br />A. Conveyance B does not incorporate any flumes, siphons or tunnels and therefore is not described in a <br />similar table. <br />' <br />� <br />� <br />� <br />� <br /> I ' <br />' 15 <br />� AECOM <br />2/22/10 <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.